1
Working Parties 2016 Dinghy Park – General Tidy – Reinstatement of tie down Points Source chain from Zinco Holes dug Concrete in Place Safety Boat hanger – Road stone around perimeter – Door on Bosun’s Store – 5S Equipment from Top Locker (sort, set, shine, standardise, and sustain) Pontoon – Move inner mooring weight – Clean Off – Check ropes and outer tubes – Drop Weight on Corner (to keep chains down)
2
Rescue Boats – Clean – Check rescue Boat Safety Kits Order spares from St JA Vacuum pack – Fix capping around tank holes Drill and tie wrap Committee Boat – Recover New Roller /Steady on Trailer – Clean – Replace Anti Bird Netting – Remote Horn Button (ILM Has button) – Flag hooks under shelf
3
Reservoir – Racing Marks Replace Bridles – Chain From Zinco – New Shackles From Zinco – Reinstate 6 Cast New weight Chain Rope New Bridle – Fixed Moorings between (1 & 8) Cast New Weight Source polysteel Rope 1 inch Source heave chain New Bouys – Repair LOMO Marks Obtain & Fit new valves Obtain new Mark (To replace one lost at the Ent Inlands) Make new ground tackle (Chain for weight, Rope and Pulleys)(Suggest we use a length og heavy chain on eack mark as it will reduce the risk of handling damage
4
Sea Hog – Clean Out – Repair Flag Staff – Remove Old control Box and – Clear top Container – Bolt on Transom plates Training Boats (Check and Repair) ( Youth Academy) – Topper – Pico New Sails New Covers – Wayfarer – Omega – 420 – Racing 420 – Oppie – Laser Kit Store – Collect kit from around the estate – Sort and Rehang Flag Pole – Re Rope – Reinstate Club Burgee and Flags