Point Pleasant Bridge Disaster Group 19
2
Events and consequences 5PM December 1967 46 people killed, 9 injured Only major connection between West Virginia and Ohio
3
Background Ohio river US highway 35 Point Pleasant, West Virginia, Kanauga, Ohio Two lane, 670m American Society of Civil Engineers
4
Technical Background First of its kind Eye bars linked in pairs like a chain Pin passed through eye Heat treated carbon steel Load of 4 million kg Ultimate strength of 725MPa Elastic limit of 520MPa Max working stress of 350Mpa
5
….continued Bedrock foundation too costly Reinforced concrete trough 60m long and 10.2 m wide supported by piles Shifting loads and temp. variations 40 m high pinned rocker towers
6
Technical factors contributing to collapse Cleavage fracture of an eye Minute crack when casting Stress corrosion and corrosion fatigue Ductile fracture near pin South chain then snapped
7
Human and managerial factors Lack of knowledge in 1927 Vindicates designer? Not accessible for visual inspection Bridge seemed to be performing well for 40 years
8
….continued Average weight of motor car Should have been addressed
9
Lessons learnt Secretary for transport Critical flaw sizes in bridge building materials New inspection equipment Techniques for protection, repair and salvage Periodic inspection of all nation’s bridges