Download presentation
Presentation is loading. Please wait.
Published byEmily Hopkins Modified over 8 years ago
1
The K-12 Learning Infrastructure Program & Wi-Fi Upgrade Initiative FEBRUARY 25, 2016
2
Need to Complete Now: 2015-2016: Confirm Form 486 has been filed A day of funding is lost for every day late http://www.usac.org/sl/about/outreach/videos/FCC-Form-486-Preparing-to-File.aspx Log into EPC Verify all sites are included Non-instructional Facilities (NIFs) should also be present Call 888-203-8100 for additions Connectivity Questions Based on current status http://www.universalservice.org/sl/about/outreach/videos/FCC-Form-471-Manage-Connectivity- Questions.aspx http://www.universalservice.org/sl/about/outreach/videos/FCC-Form-471-Manage-Connectivity- Questions.aspx
3
Reminders: Head Start is Not eligible for funding in Virginia http://www.universalservice.org/sl/applicants/beforeyoubegin/non-traditional/eligibility- table.aspx#VAhttp://www.universalservice.org/sl/applicants/beforeyoubegin/non-traditional/eligibility- table.aspx#VA Your Central Office needs a Billed Entity Number (BEN) that is unique to it. The division should have a different BEN.
4
Reverting unused funds Form 500 http://www.universalservice.org/sl/tools/forms/default.aspx Paper form at this time Used for multiple purposes Block 3 used for reducing or canceling an FRN Suggest you send U.S. Postal, Return Receipt Requested Keep a copy Put a copy of your postal receipt with you 500 copy
5
Student Data Available Should be entered into EPC prior to 471 Data by school can be found on the right side of web page http://www.doe.virginia.gov/support/nutrition/statistics/index.shtml Video Tutorial for updating school profiles http://usac.org/sl/about/outreach/videos/FCC-Form-471-Update-School-Profile- Information.aspx Contact Client Services Bureau if problems with exceptional schools 888-203-8100
6
Full-time and Part-time Students School profiles includes the following fields: Number of full-time students Number of part-time students Peak number of part-time students Total number of students eligible for NSLP Category 2 budgets may include part-time students, with the maximum being the peak number of students in the building. Example: 500 full-time student, 50 part-time students from 8:00 – 10:00, 75 part-time students from 1:00 – 3:00; Peak number of students = 575
7
Divisions to do Get existing multi-year contracts in electronic format Start filing your 470s for services if you are not using a state 470 SLD has a new File Along With Me Blog http://filealongwitherate.org/ Determine your Cat 2 needs; Will demo Estimator Tool next week http://friday.institute/cat2estimator:va
8
Category 2 Cost Estimator Tool This web-based tool is provided by the Friday Institute for Educational Innovation at North Carolina State University to help schools estimate their equipment needs and budget for Category 2 upgrades. You will enter the following data into tool: Basic division information including number of students and classrooms per school Estimated number of cable runs (copper and fiber) needed per school After submission, you will receive a report with an estimated equipment list: Number of APs needed Number of high density APs needed Number of switches needed Estimated cost of equipment, cabling, and installation Available E-rate funding based on $150 per student budget Note: The equipment list and costs are estimates only. Common sense should be used when putting together a bill of materials and budget.
9
Virginia to do Demo Cat 2 Estimator Tool Award contracts Provide guidance on service provider selection via mini-bid process Provide guidance on filing Form 471
10
Questions? va@erateservices.com
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.