Download presentation
Presentation is loading. Please wait.
Published byAustin Stephens Modified over 8 years ago
1
Operating experiences at JSPL, BF-II Achieving higher performance indicators with inferior raw materials By : Hemant Upadhyay Arvind Kumar Bhagat
2
Copyright © 2010 Jindal Steel & Power Ltd. Sl. No. ParameterUOMBaseCurrent 1Productivityt/m3/d2.532.97 2Coke RateKg/thm343364 3PCI RateKg/thm154138 4Fuel RateKg/thm511526 5Al2O3 In Metallic%2.653.01 6SiO2 In Metallic%4.384.54 7Coke Ash%12.316.31 8Slag RateKg/thm298350 9Hot Blast Temperaturedeg C11741147 10O2 enrichment%3.987.45 Base Case
3
Constraints
4
Copyright © 2010 Jindal Steel & Power Ltd. Raw Material Quality (SiO2) 10% increase
5
Copyright © 2010 Jindal Steel & Power Ltd. Raw Material Quality (Al2O3) 15% increase
6
Copyright © 2010 Jindal Steel & Power Ltd. Raw Material Quality (Total Gangue) 13.5% increase
7
Copyright © 2010 Jindal Steel & Power Ltd. Raw Material Quality (Ash) 38%
8
Copyright © 2010 Jindal Steel & Power Ltd. Output : Slag rate
9
Copyright © 2010 Jindal Steel & Power Ltd. Fuel Consumption 5%
10
Copyright © 2010 Jindal Steel & Power Ltd. Productivity
11
Enablers
12
Copyright © 2010 Jindal Steel & Power Ltd. Oxygen Enrichment
13
Copyright © 2010 Jindal Steel & Power Ltd. Productivity Correction There should be some thing else also Correcting the base productivity for all +’s & -’s, the adjusted figure is less than the actual
14
Copyright © 2010 Jindal Steel & Power Ltd. Burden Distribution Optimization
15
Copyright © 2010 Jindal Steel & Power Ltd. Burden Distribution Optimization
16
Copyright © 2010 Jindal Steel & Power Ltd. Sinter in Burden
17
Copyright © 2010 Jindal Steel & Power Ltd. Hot Blast Temperature
18
Copyright © 2010 Jindal Steel & Power Ltd. Optimization of coke quality with PCI
19
Copyright © 2010 Jindal Steel & Power Ltd. Practices followed at JSPL, Raigarh Cold strength Fines Input Consistent quality of coal for injection with medium VM Hot strength Moisture Gangue / Ash Mean size Raw Material Quality Not in Control
20
Copyright © 2010 Jindal Steel & Power Ltd. Metal & Slag Level in Hearth
21
Outcome
22
Copyright © 2010 Jindal Steel & Power Ltd. Uniform Hot Metal Temperature
23
Copyright © 2010 Jindal Steel & Power Ltd. Gas Utilization
24
Copyright © 2010 Jindal Steel & Power Ltd. Pulverized Coal Injection
25
Copyright © 2010 Jindal Steel & Power Ltd. Fuel Rate Correction - 1
26
Copyright © 2010 Jindal Steel & Power Ltd. Fuel Rate Correction - 2
27
Copyright © 2010 Jindal Steel & Power Ltd. Production cost
28
Copyright © 2010 Jindal Steel & Power Ltd. 1.It is possible to optimize the process to get higher performance indices with inferior raw materials also. 2.It is advisable to do a detailed cost benefit analysis before going for any such experiments. 3.On paper it may seem lucrative, but it’s always an opportunity loss to operate a furnace at higher slag rates. 4.In general it should be discouraged to charge garbage in Blast Furnace. Conclusion
29
THANK YOU
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.