PRIORITIES IN DEVELOPMENT OF ROAD INFRASTRUCTURE BG 2020 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО
2
PAN EUROPEAN TRANSPORT CORRIDORS MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО
3
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО
4
Road Junctions – 268 km MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО Motorways – 418 km I Class roads – 2975 km I Class roads – 4027 km
5
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО
6
Metropolitan area of the Capital city of Sofia; 9 main development poles of transnational importance: Plovdiv, Burgas, Varna, Stara Zagora, Ruse, Pleven, Vidin, Blagoevgrad, Veliko Tarnovo; Main development axes based on the TEN-T corridors and on other transport infrastructure of European importance. MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО The secondary development poles and axes in Bulgaria: 10 secondary development poles of national importance: Vratsa, Gabrovo, Silistra, Dobrich, Shumen, Sliven, Haskovo, Kardzhali, Smolyan, Kyustendil; Secondary development axes based on other transport infrastructure of European importance. Main development poles and axes in Bulgaria
7
Average Good Bad Condition of national roads in percents MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО 1985199019952000
8
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО Average daily traffic intensity per year
9
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО Investments in road network 2001-2009 in mln. BGN
10
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО Expected investments in road network Till 2020 in mln. Euro
11
Operational programme Transport (Indicative cost ): 990 mln. Euro Operational programme Regional development 255 mln. Euro ISPA programme: 153,25 mln. Euro Programme “State investment loans” : Transit roads 5 project /Co-financed by loan from EIB/ cost 705 mln. Euro ; Project for rehabilitation of road infrastructure /Co-financed by loan from IBRD/ cost 144 mln. Euro. Planned investments for programmes with financing by EU for the period 2007-2013: MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО
12
Operational Programme Transport Σ 990 Million Euro MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО Remaining programme period 2010 – 2013 1. Trakia MW (from Sofia to Burgas) – 115 km – 350 Million Euro 2. Mariza MW (from BG to TR) – 67 km – 208 Million Euro 3. Struma MW (from BG to GR) – 132 km – 250 Million Euro 4. Kardshali – Podkova (from BG to GR) – 28 km – 32 Million Euro 5. Hemus MW (from Sofia to Varna) – 8.5 km – 32 Million Euro 6. Е-79, Vraza – Botevgrad (north of Sofia) – 31 km – 85 Million Euro 7. Е-79, Vidin – Montana (from RO to BG) – 20 km – 32 Million Euro
13
OPT – 2007-2013 PROGRAMME PERIOD OPT – 2014-2020 PROGRAMME PERIOD MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО Operational Programme Transport
14
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО Operational Programme Transport Programme period 2014 – 2020 1. Struma MW Lot 3 /Blagoevgrad - Sandanski/ Total length: 67.5 km, Indicative cost 500 mln. Euro 2. Trakia MW Lot 6 /Burgas – Varna/– Length:100 km, Indicative cost: € 350 mln. Euro 3. Trakia MW Lot 0 /Sofia – Kalotina/– Length: 50 km Indicative cost: € 150 mln. Euro 4.Express way “Sofia – Gyueshevo” Length: 85 km Indic. cost: € 200 mln. Euro 5.Express way “Ruse – Shumen ”, indicatice cost 150 mln. Euro 6.Express way Ruse – Veliko Tarnovo – Gabrovo, incl. Shipka tunnel – Stara Zagora – ind. Cost 350 mln. Euro 7. “Hemus” Motorway 245 km indicative cost 1.2 bln. Euro 8. “Rila” express way /Gyueshevo – Ihtiman/ 80 km, indicative cost 200 mln. Euro 9.Sofia ring road north tangent, indicatice cost 500 mln. Euro 9. Bridges on the Danube river – Silistra-Kalarash, Oryahovo-Beket, indicatice cost 400 mln. Euro Σ 4 Billion Euro
15
OPT – 2007-2013 PROGRAMME PERIOD OPT – 2014-2020 PROGRAMME PERIOD MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО Operational Programme Transport
16
Modernization of road “Ruse – Shumen” MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО Operational Programme Transport Programme period 2014 – 2020
17
OPRD Phase 1 14 Lots, ongoing tender procedures for construction works. Expected beginning of construction – 07.2010. OPRD Phase 2 14 Lots, tender documents are submitted for approval. Expected start of tender procedures – first half of 2010. Expected beginning of construction – End of 2010. MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО Operational Programme Regional Development 2007 - 2013 OPRD Phase 3 Reserve list of 14 Lots, ready to be included in the programme.
18
Transit roads 5 programme MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО
19
PROGRAMME FOR HARMONIZING THE NATIONAL PRIMARY ROAD NETWORK MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО Phase 1 Phase 2 Phase 3 Phase 4
20
Road programmes in preparation MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО Programme for rehabilitation and reconstruction of bridges – 64 bridges, indicative cost 60 mln. Euro Road safety programme – 100 dangerous road crossings. Indicative cost 30 mln. Euro Road maintenance – new approach and contracts 200 mln. Euro per year Operational programme Transport 2014 – 2020 – 4 bln. Euro Operational programme Regional Development 2014 – 2020 1 bln. Euro Danube strategy – Priority axes “Connectivity”
21
THANK YOU FOR YOUR ATTENTION MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО “Vision without action is only dreaming, action without vision is only passing time, vision with action can change the world" Nelson Mandela