1 Coastal Commission Staff Presentation Item W13A (City of Huntington Beach) Warner Avenue Bridge, Huntington Beach, Orange County
2
Proposed Development 1.Repairs to road bed 2.Repairs to bridge abutments 3.Restoration of eroded revetment 4.Replacement of damaged concrete railing and fence 1 2 3 3 4 4
3
Revetment width reduced 8 inches Proposed Work to Revetment Area of proposed work
4
Construction Access Areas Construction Access Corridor
5
Temporary and Permanent Impacts Temporary Impacts to Coastal Sage Scrub Permanent Impacts to Soft Bottom Habitat Permanent Impacts to Coastal Sage Scrub Impacts to Non-native grassland. To be restored to Coastal Sage Scrub
6
Proposed Fence Design