Download presentation
Presentation is loading. Please wait.
Published byScot Hutchinson Modified over 8 years ago
1
Co-ordination & Harmonisation of Advanced e-INfrastructures WP4 : Modelling the cooperation of European e-Infrastructures with non-European ones Ludek Matyska; CESNET; Czech Republic
2
Workpackage Objectives Study and propose a model for cooperation and interoperation between EU and non-EU e-Infrastructures Perform an organizational study, taking into account regional “customization” Produce a roadmap for the follow-up of extensions to the EGI, based on feedback from actors worldwide on the proposed model 13/12/2010CHAIN Kick-off meeting, Rome2
3
Partners and Effort INFN26 PM CIEMAT 4 PM GRNET 8 PM CESNET 9 PM UBUNTUNET 8 PM CLARA 7 PM IHEP12 PM PSA 8 PM 13/12/2010CHAIN Kick-off meeting, Rome3
4
Structure Task 4.1: Organizational study Leader CESNET Task 4.2: Regional Operations Studies Leader INFN Task 4.3: Roadmap Leader CESNET 13/12/2010CHAIN Kick-off meeting, Rome4
5
Task 4.1 Organizational Study Together with WP2 and WP3 to study an organizational model for cooperation and interoperation between EGI and external e-Infrastructures Evaluate the opportunities from evolution of EGI Asses interoperation issues worldwide Evaluate appropriate measures for smooth interoperability in the near future Strong and continuous cooperation with EGI Outputs are expected to be taken by EGI An MoU is foreseen 13/12/2010CHAIN Kick-off meeting, Rome5
6
Task 4.2 Regional Operations Studies Assessment and evaluation of specificities of the various regional operations, interoperability with different middleware and migration toward standards (with EGI planning) Based on the work of WP2 Continuous interaction with regional e-Infrastructures In the second phase, it will assess the applicability of T4.1 results, differentiating between regions A developing region (e.g. Africa) A well established e-Infrastructure with non-EGI middleware (e.g. China) 13/12/2010CHAIN Kick-off meeting, Rome6
7
T4.3 Roadmap A follow up of the project Address the timeline of the implementation of CHAIN results Roadmap foundations: A detailed analysis of changes in EGI due to new organizational structure The characteristics of non-EU e-Infrastructures, highlighting commonalities and differences Opportunities offered by existing and emerging standards Taking into account paradigms like Virtualization, Voluntary Computing and Cloud Computing 13/12/2010CHAIN Kick-off meeting, Rome7
8
Deliverables and Timing D4.1: Specificities of the various regional e-Infrastructures CESNET, M8 (July 2011) Highlight and justify different activities needed to acknowledge diversities of regions D4.2: Report on the applicability of the preliminary results of the Organizational Study INFN, M16 (March 2012) Results of the pilot to demonstrate the applicability of T4.1 results in different regional situations D4.3: Organizational study for interoperations of EGI with external grid infrastructures CESNET, M22 (September 2012) The proposal of an organizational model D4.4: Roadmap of follow up activities CESNET, M24 (October 2012) Roadmap for e-Infrastructures in different regions and the activities needed to deploy the proposed organizational model 13/12/2010CHAIN Kick-off meeting, Rome8
9
Milestones MS8: Brainstorming Meeting jointly organized with EGI M3 (February 2011) MS9: Preliminary organizational model presented at the fourth thematic workshop M20 (July 2012) 13/12/2010CHAIN Kick-off meeting, Rome9
10
Major Results and Outcomes Organizational study with regional customization applied to a shared organizational model for sustainability The final results are The organizational study (defines interoperations) The Roadmap (defines the follow up activities) 13/12/2010CHAIN Kick-off meeting, Rome10
11
Way of work A series of cyclic processes WP2 results + Joint meetings with EGI + Regional e- Infrastructures Deliverables D4.2 and D4.3 Close collaboration with WP2 and WP3 Based on results obtained therein Close collaboration with EGI.eu and EGI InSPIRE to maximize their involvement in the definition of the proposed model the goal is to ensure the Organizational Model and the Roadmap will be actually adopted/used by EGI.eu 13/12/2010CHAIN Kick-off meeting, Rome11
12
Immediate activities Organization of the Brainstorming meeting with EGI Planned for February 2011 There will be EGI Council meeting on 17 th and 18 th February Regional e-Infrastructures representatives D4.1 Specificities of the various regional e-Infrastructures Due in July 2011 Based on results from WP2 The questionnaire results available in May 2011 (timely availability of results critical) Also WP3 contribution through D3.1 due in May 2011 More specific definition of partners’ involvement and responsibilities Participation in the Brainstorming event Input into the D4.1 (in parallel with the input from the questionnaire) 13/12/2010CHAIN Kick-off meeting, Rome12
13
Thank you for your attention Further questions? 13/12/2010CHAIN Kick-off meeting, Rome13
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.