Download presentation
Presentation is loading. Please wait.
Published byPhoebe Clarke Modified over 8 years ago
1
Building for Learning Project Photo Progress Report September 2010 Project commencement 21 st September 2009
2
Furniture removal and storage ready for refurbishment works 21 st Sept 2009
3
Erecting scaffolding before roof replacement part of refurbishment works 22 nd Sept 2009
4
Chimney removal (Murphy’s) part of roof replacement Refurbishment works 23 rd Sept 2009
5
Project Manager Graeme Connelly, Architect Lindsey Jordan and Structural Engineer Mark – steel column design Sept 23 rd, 2009
6
Heater replacements in rooms 1-5 part of refurbishment works 24 th Sept 2009
7
New roof going up (over Room 1) 25 th Sept 2009
8
Student Computer Lab relocation ready for Room 6-9 demolition 28 th Sept 2009
9
New roof going up (over room 2) 28 th Sept 2009
10
New roof going up (over room 3) 29 th Sept 2009
11
Electrics being made ready for refurbishments 29 th Sept 2009 Denis – In Touch Computing making ready for Admin move to Room 3 for refurbishment works 30 th Sept 09
12
The thumbs up from WorkSafe Inspector Terry Wilson on our building works (the biscuits helped to sweeten him up!) – 29 th Sept 2009
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.