Download presentation
Presentation is loading. Please wait.
Published byDiana McGee Modified over 8 years ago
1
Introduction Malte Backhaus CPIX test system developers workshop 31/03/2015 to 01/04/2015 Malte Backhaus1
2
Thanks Thanks to all participants Thanks to the CPPM team for the spontaneous workshop organization CPIX test system developers workshop 31/03/2015 to 01/04/2015 Malte Backhaus2
3
Aims of the workshop Improve development efficiency Get to know each other (!!!) Get an overview of the systems to be developed and their status Point eager new forces to system documentation and code Compile a ToDo list Define milestones Assign tasks CPIX test system developers workshop 31/03/2015 to 01/04/2015 Malte Backhaus3
4
CPIX demonstrator program schedule CPIX test system developers workshop 31/03/2015 to 01/04/2015 Malte Backhaus4 ABCD Submission of designs Feb 2015 – June 2015 Characterizat ion in Laboratory Sep 2015 – Oct 2015 Test beamsNov 2015 –March 2016 –Nov 2015 – This schedule naturally drives the test system development timeline To be completed and extended with more milestones:
5
Some Links To be completed during the workshop: HV/HRCMOS Twikis: Main page https://twiki.cern.ch/twiki/bin/view/Atlas/HVHRCMOSPixelUpgrade https://twiki.cern.ch/twiki/bin/view/Atlas/HVHRCMOSPixelUpgrade PCB section https://twiki.cern.ch/twiki/bin/viewauth/Atlas/HVHRcmosPCB https://twiki.cern.ch/twiki/bin/viewauth/Atlas/HVHRcmosPCB USBpix SVN (C++ and PCBs) http://icwiki.physik.uni-bonn.de/svn/USBpixI4/ http://icwiki.physik.uni-bonn.de/svn/USBpixI4/ USBpix Homepage http://icwiki.physik.uni-bonn.de/twiki/bin/view/Systems/UsbPix http://icwiki.physik.uni-bonn.de/twiki/bin/view/Systems/UsbPix Bonn redmine (to be ported to Git-Hub) https://silab-redmine.physik.uni-bonn.de/ https://silab-redmine.physik.uni-bonn.de/ Basil: https://github.com/SiLab-Bonn/basil Docs: http://basil.readthedocs.org/en/latest/http://basil.readthedocs.org/en/latest/ Examples: https://github.com/SiLab-Bonn/basil/tree/development/examples/https://github.com/SiLab-Bonn/basil/tree/development/examples/ pyBAR: https://github.com/SiLab-Bonn/pyBAR Docs: https://github.com/SiLab-Bonn/pyBAR/wiki/https://github.com/SiLab-Bonn/pyBAR/wiki Examples: https://github.com/SiLab-Bonn/pyBAR/tree/development/examples/https://github.com/SiLab-Bonn/pyBAR/tree/development/examples/ CCPDv4: https://github.com/SiLab-Bonn/ccpdv4/https://github.com/SiLab-Bonn/ccpdv4/ Malte Backhaus5 CPIX test system developers workshop 31/03/2015 to 01/04/2015
6
More Links Malte Backhaus6 CPIX test system developers workshop 31/03/2015 to 01/04/2015
7
Spirits No “hierarchical” coordination All of us responsible for the test systems Organization Development Documentation User support Success of workshop depends on everyone's contribution to the Agenda + discussion Hands-on session Breaks + Social Dinner ToDo list preparation Please give your comments + ideas as well for the workshop organization/schedule Social dinner “most important contribution” to the workshop Thanks Marlon and Angelique CPIX test system developers workshop 31/03/2015 to 01/04/2015 Malte Backhaus7
8
Workshop schedule Plenty of hands-on and “free time” on purpose Lively discussion guided by slides rather than talks much time reserved for each contribution Today: Detailed introduction to USBpix and CaRIBOu Code installation and hands-on Social Dinner Tomorrow: Short personal introduction of everyone Compilation of Milestone and ToDo list Task assignment Time for discussion, questions, face to face development start… CPIX test system developers workshop 31/03/2015 to 01/04/2015 Malte Backhaus8
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.