Presentation is loading. Please wait.

Presentation is loading. Please wait.

ZEROTRADE SUB-PROJECT 2nd Steering Group Meeting 19th & 20th January 2012.

Similar presentations


Presentation on theme: "ZEROTRADE SUB-PROJECT 2nd Steering Group Meeting 19th & 20th January 2012."— Presentation transcript:

1 ZEROTRADE SUB-PROJECT 2nd Steering Group Meeting 19th & 20th January 2012

2 Best Practices

3 Methodology: – Investigation of BP related to the project theme from several sources. – Definition of criteria for selection: Trade sector relationship.. Sustainability. Reduction of CO 2 emissions. Transfer feasibility.

4 Best Practices Once implemented the defined methodology, the selected BP are the following: – BP1: Eco-efficient shop ArcoPlaza – BP2: Life+ Green Commerce

5 BP1 – Eco-efficient shop ArcoPlaza

6 Project synthesis: – Use of a waste heat recovery system for air conditioning and water for hygienic use of a commercial area. – Extra cost for installation of the system (30% over a standard system) is quickly balanced due to energy savings up to 50%.

7 BP1 – Eco-efficient shop ArcoPlaza Keys on selection: – Store with strong tradition in our territory. – Remarkable growing ratio (starting from one single store to current 50+). – Recovery of a heritage and representative building. – Energy saving & sustainable system.

8 BP2 – Life+ Green Commerce

9 Project synthesis: – Involvement of small retail shops against climatic change, reduction of energy consumption and waste production by simple and easy measures. – Creation of European brand “Green Commerce”. – Scheduled seminars and workshops aimed to expand environmental awareness in trade sector.

10 Keys on selection: – Public Private cooperation model (local administration, private non-profit entities). – Potential to expand at European level due to presence of ACR+ as partner. – Development of environmental self-assessment tools easy to use by the small businesses. BP2 – Life+ Green Commerce

11 Best Practices Presentations of BP are planned for the next meeting (at home!), which will allow: – Review more detailed results and effects. – Site visit (BP1). – Add possible new BP’s.

12 ZeroTrade Project Status of Development @ Nalon Valley

13 Status of Development CP1: Sub-Project Management & Monitoring -Review of actions scheduled during previous phase (Jan 2011 – Jun 2011). -Attendance to 2nd conference call. -Output: 1st monitoring internal report with FLC certificate.

14 Status of Development CP2: Exchange of Experiences and Design of Governance Model (1) -SWOT Analysis. -Best Practices selection. -Public Forum launched: involved only large retail company + most of medium retailers located in Valley.

15 Status of Development CP2: Exchange of Experiences and Design of Governance Model (2) -Voluntary Agreement signature in progress. -Review of implementation documents submitted by Lead Partner and study for application at local level.

16 Status of Development CP2: Exchange of Experiences and Design of Governance Model (3) -Local label “Triple C” (Compromiso Con el Clima)

17 Status of Development CP3: Pilot Actions and Local Dissemination Activities -Selection of retail for Pilot Actions: Supermercados El Arco. -Dissemination activities: Action Plan being defined jointly by “TripleC” members for: -World Consumer Rights Day (15/03/2012). -World Environment Day (04/06/2012).

18 Status of Development CP4: Communication Activities (1) -ZT info up-to-date at Mancomunity website: www.comarcanalon.org www.comarcanalon.org -Press release: http://www.lacuencadelnalon.com/Periodicos /lcn69.pdf (page 24). http://www.lacuencadelnalon.com/Periodicos /lcn69.pdf

19 Status of Development CP4: Communication Activities (2) -Mini site for “TripleC” design launched. -ZT brochure local design and production. -ZT labelled as Good Working Practices in the framework of EU Project Green Economy developed by FACC (Council Federation of Asturias).


Download ppt "ZEROTRADE SUB-PROJECT 2nd Steering Group Meeting 19th & 20th January 2012."

Similar presentations


Ads by Google