Download presentation
Presentation is loading. Please wait.
Published byAdela Gibbs Modified over 8 years ago
1
Vacuum: 12GeV Hardening Anthony DiPette Installation / Vacuum Group Leader 7/16/2015
2
Page 2 Vacuum: 12GeV Hardening Vacuum Improvements & Status Synchrotron Radiation Effects Vacuum Spares
3
Page 3 Vac Improvements - Linac Viewer Bellows 9 of 11 Done Viewer Location New Bellows 1L02 1L06 1L10Done 1L14Done 1L18Done 1L22Done 2L02Done 2L06Done 2L10Done 2L14Done 2L18Done Viewer Bellows
4
Page 4 Vac Improvements - Air Lines Air Lines changed from Poly to Copper – 100% Complete Copper Air Line
5
Page 5 Vac Improvements - VBV Pigtails New Connectors & Cables to replace Rad damage –100% Complete North and South VBV Pigtail upgraded for Radiation environment
6
Page 6 Vac Improvements - Position Switches VBV Position Switches from Plastic to Metal –41% Complete All-Metal Switch w/pigtail
7
Page 7 VBV Position Switches (A,B) Replaced Metal switches Steve's Rad Survey List 1L02 1L03 1L04 1L05 1L06 1L07 1L08 1L09 1L10 1L11 1L12 1L13 1L14 1L15 1L16 1L17 1L18 1L19 1L20 1L21 1L22 1L23 1L24 1L25 1L261L26A1L26 2L02 2L03 2L04 2L05 2L06 2L07 2L082L08A 2L09 2L10 2L11 2L12 2L13 2L14 2L15 2L162L16A2L16 2L172L17A 2L18 2L19 2L20 2L21 2L222L22B2L22 2L232L23A & B2L23 2L242L24A2L24 2L252L25A2L25 2L26 Vac Improvements - Position Switches VBV Position Switches from Plastic to Metal VBV Position Switches (A,B) Replaced Metal Switches 1L02 1L03 1L04 1L05 1L06 1L07 1L08 1L09 1L10 1L11 1L12 1L13 1L14 1L15 1L16 1L17 1L18 1L19 1L20 1L21 1L22 1L23 1L24 1L25 1L261L26A 2L02 2L03 2L04 2L05 2L06 2L07 2L082L08A 2L09 2L10 2L11 2L12 2L13 2L14 2L15 2L162L16A 2L172L17A 2L18 2L19 2L20 2L21 2L222L22B 2L232L23A & B 2L242L24A 2L252L25A 2L26 VBV Position Switches (A,B) Replaced Metal switches Steve‘s Rad Survey List Mike's Data Avg Radial Mike's Data Max Radial Mike's Data Avg BL Mike's Data Max BL 2L242L24A2L2414310258281896430790 2L222L22B2L2212861252782916746439 2L232L23A & B2L2310773241271094733016 2L0310241374141838732537 2L252L25A2L259280185041610122827 1L05 8487154581775324932 1L261L26A1L268477187911726429080 1L217744251071309527204 1L177645299321004220304 2L11751539940733525834 2L082L08A7294314051564227668 2L26 6892148641120421240 2L162L16A2L16681319658748223771 1L24 6729194401062819998 2L156614370201186038074 1L115717158531350628183 2L075474122251562535212 2L025346160991509025201 2L065164218341459431348 2L125054275101373825189 1L02501620928526518226 1L12 493533561592520519 1L194930326881181029611 1L13 465714807753321421 1L104459186981104531768 2L214311160051076536347 1L18428894161191345666 1L143809115761151347077 1L09380611173626428979 1L03367487191179825852 1L22332118218597323824 1L23 295216929664628138 2L1825527491540422704 2L1324178782639918516 2L1423076815889023024 2L0522527469764223682 1L25 22129837198313798 2L20218411635840923812 1L06 211671381073228415 1L0720987347427724006 1L20195836781237021459 1L1513722776576021597 2L1912636802779530006 1L1611474060489620528 2L10111887718306414 1L089906142702431234 2L172L17A8701712488012489 1L042481075352817874 2L0988200245857 2L04322301591202 Replace during SAD 2015 2L24B 2L22A 2L03A & B 2L25B 1L05A & B 1L26B 1L21A & B 1L17A & B 2L11A & B 2L08 B 2L26A & B 2L16B 1L24A & B 2L15A & B 1L11A & B 2L07A & B 2L12A & B 1L12A & B 1L13A & B Switches Replaced: PreSAD9 SAD32 Total41 Remaining59$38k
8
Page 8 Vac Improvements – VIP’s VIP Recovery -Goal is 100% -Status @ SAD Start VIPProblemStatusCounts 3A17Pump ShortedRed0Green 4S00BRailedRed37Red 4S01ARailedRed0Yellow 4S03ARailedRed37Total VIP's 4S00CRailedRed BS00Clean High Volt Feed through. Install pwr suppliesRed 3S02Clean High Volt Feed through. Install pwr suppliesRed 9S01Clean High Volt Feed through. Install pwr suppliesRed 7S01AClean High Volt Feed through. Install pwr suppliesRed AT02RailedRed 6E03RailedRed AT05BRailed plus Small Leak foundRed 0L10Suspect leakRed AA05Spurious Burps in Pressure needs investigationRed AA06Spurious Burps in Pressure needs investigationRed AA08Spurious Burps in Pressure needs investigationRed AA09Spurious Burps in Pressure needs investigationRed 2L24ALeak checkRed 1L18Adegraded due to leaking ITVRed 1L22Abuggered out widen trip levelRed 0102not communicating with epics- had been intermittentRed 1P01Configuration issue-KetchumRed 1A24Railed needs investigationRed 1A26Railed needs investigationRed 2A16Railed needs investigationRed 4T09ARailed needs investigationRed 6S03ARailed needs investigationRed 6E01ARailed needs investigationRed 6E02Railed needs investigationRed 6T06ARailed needs investigationRed 6A01Railed needs investigationRed 8A25Yellow needs investigationRed 8R01Yellow needs investigationRed 5C03Intermittant grn, yellow, railed. InvestigateRed 9A22Railed needs investigationRed 9R07ARailed needs investigationRed 1R09Railed newRed
9
Page 9 Vac Improvements – VIP’s VIP Recovery -81% Complete VIPProblemStatusCounts 3A17Pump ShortedGreen30Green<80 uA 4S00BRailedRed3 ≥100 uA 4S01ARailedRed0Yellow80-99 uA 4S03ARailedGreen4OFF 4S00CRailedRed37Total VIP's BS00Clean High Volt Feed through. Install pwr suppliesGreen 3S02Clean High Volt Feed through. Install pwr suppliesGreen 9S01Clean High Volt Feed through. Install pwr suppliesGreen 7S01AClean High Volt Feed through. Install pwr suppliesGreen AT02RailedGreen 6E03RailedGreen AT05BRailed plus Small Leak foundGreen 0L10Suspect leakGreen AA05Spurious Burps in Pressure needs investigationGreen AA06Spurious Burps in Pressure needs investigationOFF AA08Spurious Burps in Pressure needs investigationOFF AA09Spurious Burps in Pressure needs investigationOFF 2L24ALeak checkGreen 1L18Adegraded due to leaking ITVGreen 1L22Abuggered out widen trip levelGreen 0102not communicating with epics- had been intermittentGreen 1P01Configuration issue-KetchumGreen 1A24Railed needs investigationGreen 1A26Railed needs investigationGreen 2A16Railed needs investigationGreen 4T09ARailed needs investigationGreen 6S03ARailed needs investigationGreen 6E01ARailed needs investigationGreen 6E02Railed needs investigationGreen 6T06ARailed needs investigationGreen 6A01Railed needs investigationGreen 8A25Yellow needs investigationGreen 8R01Yellow needs investigationGreen 5C03Intermittant grn, yellow, railed. InvestigateOFF 9A22Railed needs investigationGreen 9R07ARailed needs investigationGreen 1R09Railed newGreen Joint effort troubleshooting by Vac & Vac ICN to include cables, connectors, cards, VIP hi-potting, VIP repair, and power supply replacements. Additional improvements made by Vac ICN to Rad harden the VIP power supplies with upgraded HV diodes.
10
Page 10 Synchrotron Radiation Effects –Analysis of Thermal effects* Synchrotron radiation heating was evaluated in the higher energy arcs (x-direction) and the higher energy spreader/recombiner dipoles (y-direction). Arc’s max temperature at girder bellows flange is 70 deg C (158F) ZA’s max temperature at top of chamber is 39 deg C (102 F). Reports indicate these are conservative temps higher than expected and indicate the synchrotron radiation heating will not be a problem for 12GeV CEBAF. –Run Experience During our Spring run some vacuum excursions were noted in the 2R and 2S regions. As a precautionary measure additional Turbo pumps were added to the common vacuum in 2R and 2S (unexpected synchrotron radiation effect?). The pumps provided no change in the vacuum state and were valved out. The machine settled out and the Turbo’s remained valved out for the duration of the run. –Actions Taken The turbo pumps were removed and serviced, if needed they are ready to be deployed. *”Synchrotron Radiation Power at CEBAF 12 GeV Upgrade” B Yunn and Eduard Pozdeyev. TN-06-004 *“Synchrotron Radiation Thermal Effect on the 12 GeV CEBAF” - June 20, 2006, M. Wiseman, S. Slachtouski, K. Wilson, and B. Yunn *“Synchrotron Light Radiation Heating in 1 st Spreader” – 2010 (unreleased), C. Dubbe
11
Page 11 Vacuum Spares –Position Switches, Metal - 0 ($640 ea), Plastic - 24 –VBV’s Linacs – 4 General Accel – 20 –VIP’s New 11 L/s – 2 New 25 L/s – 1 ($1800 ea) 11 L/s ready for rebuild ($600 ea) 11 L/s on Rad Hold – 21 (approx. 6 mo to 1 yr to release) –VIP Ion Packs/ Power Supplies - 11 –Tunnel Pump Carts - 4
12
Page 12 Vacuum: 12GeV Hardening - Conclusion –Proactive improvements have been made to the Vacuum System based on downtime and repairs and is ready for the 12 GeV run. –Vacuum Improvements will continue during upcoming SAD’s.
13
Page 13 Vacuum: 12GeV Hardening Thank You!!! Anthony Dela Cruz George Greenfield John Heckman Leo Ketchum Jim Kortze Mark Lester Greg Marble Elliott Smythe Joshua Thomason
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.