Download presentation
Presentation is loading. Please wait.
Published byHoward Leonard Modified over 8 years ago
1
1 STS41G Left Wing Lost Tile (RTV Reversion)
2
2 STS41G Left Wing Impact Damage 20” x 10” x 1.5”d
3
3 STS 26R Right Wing Impact Damage 17.5” x 1.5” d
4
4 STS 27R Missing Chine Tile
5
5 STS 27R Debris Damage 15” x 6” x XX” d
6
6 Meteoroid/Orbital Debris Damage During STS-45 OV-104 Wing Leading Edge Panel 10 RH Outer Mold LineInner Mold Line FWD
7
7 Meteoroid/Orbital Debris Damage During STS-45 OV-104 Wing Leading Edge Panel 10 RH
8
8 STS 73 Right Wing Impact Damage 4” x 10” x 1”d
9
9 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 1 RCC Panel # 18 1 RCC Panel # 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 19 20 22 21 TPS Inspection Requirements Orbiter Lower Surface
10
10 18 1 RCC Panel # 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 RCC Panel # 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 19 20 22 21 18 19 20 21 22 TPS Inspection Requirements Orbiter Upper Surface
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.