MSD 12711 Parbake Mezzanine Final Meeting Clem Pin (ME) Sam Phillips (ME) Graham Frasch (ME)Simon Stam (ME) Matt Lynch (EE) Stefan Colegrove(EE)
2
Agenda Design overview Testing review Customer needs Space constraints Optimal bread sorting Next steps
3
Project Task To reduce the ergonomic risks associated with bread packaging in the Parbake Mezzanine ◦ Scope limited to Mezzanine room.
4
The Design
5
Testing Testing DaysTesting Hours 10/18/2011 1.5 10/30/2011 3 12/3/2011 2.5 12/4/2011 3 12/11/2011 2 1/13/2012 3 1/15/2012 2 1/20/2012 2.5 1/27/2012 4 1/29/2012 3 1/31/2012 2.5 2/5/2012 2 2/12/2012 3 2/16/2012 3 Total Days: 12 Total Hours: 37 Man Hours: 185
6
Pane Italian
7
Rounds
8
Testing Summary ProductGuidesCounterSorter Percentage RollsMediumVery GoodGood 12.4% RoundsVery Good Good 23.5% LoafMediumVery GoodGood 49.8% BaguettesPoorVery GoodGood 14.3%
9
Customer Needs Customer Need # ImportanceDescriptionProgress as of 2/24/12 CN1High Reduces Ergonomic Risk Yes CN2High Fills Boxes Correctly * CN3Med Is Durable Yes CN4Med Can be Cleaned/Sterilized Yes CN5High Can Maintain Production Rate * CN6Med Can be Easily Repaired Yes CN7High Meets Food Safety Requirements Yes CN8High Handles 80% of Products * CN9Med Meets Budget/ROI * CN10High Safely Fits in Allotted Area Yes CN11High Is Reliable *
10
*Comments CN2 – Counter and Lane Sorter work ◦ Awaiting system integration CN5 – Not all products tested ◦ Rounds Yes ◦ Pane Italian dependant on upstream orientation CN8 – 69% Tested CN11 – Most recent testing required operator intervention once every 10 minutes
11
Space Constraints Bread Sorting ◦ Current approach requires more conveyor area Box Coaster ◦ Requires more space between top conveyor and bread loading area Room Layout ◦ Current empty box stacking conflicts with required space
12
Conditions for Optimal Bread Sorting General Product Flow Observed to be 60/40 with right side bias 50/50 is ideal Conveyor speed increase Decreases instantaneous product density at guides Pane Italian Reorientation after oven exit Single file orientation as proposed by 5-second delay
13
5 Second Delay
14
Lessons Learned Sorting bread is a complex process Fabrication Reworks ◦ CAD drawings provided were ambiguous. Sit down meeting might have been required Upstream Sorting ◦ Made late push which showed promise ◦ Initial focus limited to the mezzanine
15
Next Steps Investigate upstream orienting solutions Commit to conveyor speed increase ◦ Purchase different gear drive Bring conveyance vendor in house for assessment on box conveyor
16
Wegmans Recommendations Provide onsite storage for testing components Provide access to a small basic tool set ◦ Much time was spent looking for tools to use
17
Questions?