Download presentation
Presentation is loading. Please wait.
Published byAgnes Sims Modified over 8 years ago
1
Flevoland wide and pure that fits windenergy
2
Windenergy in Flevoland - te role of the province - the situation in Flevoland - some history in planning - the expectations for the future - how come to resolutions
3
Windenergy in Flevoland The role of the province: - Agreement BLOW says 220 MW in 2010 - Facilitating spatial planning process - Consultation in Regional Planning Process
5
Windenergy in Flevoland the situation in Flevoland - survay windturbines in Flevoland - spatial planning map windenergy
6
1994
7
1999
8
2003
9
Situation 2003/04 Municipallity Power in MWNumber Windturbines Almere 1710 Dronten11992 Lelystad 8185 Noordoostpolder 3285 Urk 0 0 Zeewolde133 165 Flevoland 382 437
10
Plans for windenergy untill 2005 after 2005 consession planedplaned Almere 25 35 Dronten 45 Lelystad 45 135 Noordoostpolder 45 145 Urk Zeewolde 20 90 Flevoland 65 205 315
12
Windenergy in Flevoland some history in windenergy planning - 1995 / 1996 MER (Environmental Effects) based on the idee: a few greater lines and little individual projects every municipallity fits its own policy - 2000 results fixed in Provincial Spatial Plan
14
New / additional elements for Flevoland - Climate policy - Evaluation processing windenergy plan - Information to / discussion with population - New spatial design and plan Windenergy in Flevoland
15
some history in windenergy planning - province facilitate conditions in spatial plan and management rules profit: project plans fits due to situation handicaps: - diversification and disorderly - no guaranty for the greater projects
16
Windenergy in Flevoland some history in windenergy planning The planning process takes still 8 - 10 years smaller projects ( 6 - 10 turbines, < 15 MW) due to quarrel participants greater projects ( > 10 turbines, > 15 MW) different procedures without (fine-) tuning and great amount of participation uncertainly of the policy of the government
18
Windenergy in Flevoland Expectations for the future - the owners ask for substantial more opportunities - windenergy has grown to an innovative industrial activity - repowering and reconstruction is necessary this gives us a new key for integration interests - due to the measurements we need a new spatial design
19
Expectations for the future - coöperation is necessary - search for new and other locations - request owners: province facilitate repowering and reconstruction Essential for all these actions is communication Windenergy in Flevoland
21
how to come to resolutions - study repowering and reconstruction a model which fit all the individual contributions for all the participants - study new spatial and landscape design an objective model for natural positioning of large windturbines in the landscape
22
Windenergy in Flevoland how to come to resolutions: WE COMMUNICATE: - forum windenergy: delegate and alderman's - forum public servants - dialog with all the organisations and consultants (due to farmers, habitat, environment, energy, etc.) - wind readings and excursions for the population - windenergy information centre
23
Windenergy in Flevoland Conclusions: - the province facilitate the planning process - the planning process takes still 8 - 10 years - methods for integrate interest and planning will help / are necessary - communication is essential for the support - the municipalities have the key
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.