Download presentation
Presentation is loading. Please wait.
Published byCamron Hector Harris Modified over 8 years ago
1
NERSA MYPD2 PUBLIC HEARINGS PRESENTATION 20 th January 2010
2
MYPD vs. NIRP – 30 November revised MYPD released – 31 December NIRP gazetted
3
MYPD vs. NIRP
4
REFIT Cashflows must be excluded
5
Pay now fly later??? – IPP’s can smooth the curve – Government’s 30% target of generation coming from IPP’s
6
MYPD & White paper Required installed wind capacity = 4 700 MW in 2013 (4% of planned)
7
Erroneous exclusion of wind power from base load calculation
8
Free market economy – Concentrated Solar Power research budget – REFIT for Pvt sector Sere for Eskom
9
Conclusion DoE policy must guide MYPD Public process required to formulate next NIRP Percentage of energy coming from IPP’s be increased Revenues for IPP’s ring fenced outside of Eskom
10
Thank You Mark Tanton Deputy Chairperson SAWEA mark@sawea.org.za
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.