Download presentation
Presentation is loading. Please wait.
Published byDora Copeland Modified over 8 years ago
1
OHIO River-Net Objectives Proposed Network European RIS Example Project Plan
2
Objectives 1 Network infrastructure specification 2 2 Potential business applications 3 ROI analysis 4 Computer simulations of the most important applications
3
Understanding Players OHIO RIS USCGUSACE PPC Shippers/ Receivers Barge Lines Terminal Operators
4
Proposed Network
5
European RIS Features Waterway Charges & Dues Fairway Information Services Traffic Management Calamity Abatement Service Port &Terminal Management Cargo Management
6
RIS Features Fairway Information Services Provide information about the use and status of the inland waterway infrastructure Support strategic navigation decision-making (plan and monitor a trip). Target User: Barge lines
7
RIS Features Traffic Information and Management Services Strategic/tactical traffic information Waterway administration for safe navigation Vessel Traffic Service (VTS) »Accidents prevention by means of shore based monitoring Lock and Bridge Planning »Reduction of waiting time and smoothing of the traffic flow Target User: Barge Lines, USCG
8
RIS Features Calamity Abatement Service Register vessels at the beginning of each trip and update data during the voyage In case of accident, immediate and expedited measures to rescue the vessels thanks to the data Target User: Barge Lines, USCG
9
RIS Features Port and Terminal Management ETA( Estimated Time of Arrival) information of approaching vessels supports the overall terminal utilization and smooth passage of vessels Reduction for transshipment time In case of insufficient terminal capacities, the terminal operator inform his Requested Time of Arrival (RTA). Target User: Barge Lines, Terminal Operator
10
RIS Features Cargo and Fleet Management Detailed information on the cargo transported Information on the vessels and the fleet Target User: Barge Lines, USACE
11
RIS Features Waterway Infrastructure Charges and Harbor Dues Use of voyage data to automatically calculate charge and initiate invoicing procedures Target User: Government
12
Project Plan Post Demo Review Demo ROI Identify Business Services Design Network Infra. Requirement Analysis Scope Definition
13
CMU River-Net Project Member List NameName (Eng)Cell PhoneEmail Sunkyung ParkSunny412 310 2305sunkyung@andrew.cmu.edu Sungju ChoJoe412 335 9713sungjuc@andrew.cmu.edu Yunsuh ChunYun412 848 6918ychun@andrew.cmu.edu Hyeon YuShawn412 719 6054hyeony@andrew.cmu.edu Hyunsu JunSue412 841 1849hyunsuj@andrew.cmu.edu Yi-Chan HoYi-Chan347 249 7658yichanh@andrew.cmu.edu
14
Q&A
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.