Download presentation
Presentation is loading. Please wait.
Published byHorace Long Modified over 8 years ago
1
LIGO- G070447-00-R Amaldi7 July 14 th, 2007 R. Ward, Caltech 1 Prototyping for eLIGO: Power Recycled Fabry Perot Michelson DARM RF ITMy ITMx BS PRM SRM SP 33 13m MC SP166 REFL AP 33 OMC DARM DC Fully instrumented prototype Initial LIGO-style single pendulums, passive seismic stacks Initial LIGO digital control system, interfaced with aLIGO style subsystem for DC Readout OMC length and alignment controlled digitally via dither locking 40m ETMx ETMy
2
LIGO- G070447-00-R Amaldi7 July 14 th, 2007 R. Ward, Caltech 2 Better Signal Detection: Output Mode Cleaner OMC removes most of the junk light→no more photodetector saturations, less shot noise, and no more spatial overlap problem DC Readout requires an in-vacuum, seismically isolated output mode cleaner and photodetector New noise sources include OMC length and alignment noise Caltech 40m
3
LIGO- G070447-00-R Amaldi7 July 14 th, 2007 R. Ward, Caltech 3 The 40 meter OMC Input light Output light
4
LIGO- G070447-00-R Amaldi7 July 14 th, 2007 R. Ward, Caltech 4 Perfecting the spatial overlap : cleaning the modes AS PORT Before OMC OMC Transmitted RF local oscillator + junk light DC local oscillator + signal field
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.