Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.

Similar presentations


Presentation on theme: "Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for."— Presentation transcript:

1 Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA

2 Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for 2 inner ones of Gap-1 and 2) and 8. Recap Clamp Test

3 This screw hole needs to be Slightly shifted Spacer Incompatibility in South Mike will work on this.

4 Fiber Scope Small diameter  =6mm Focus 20 ~ 80 mm Side mirror ~54,000Yen ~10mm pad Scope angle

5

6

7 デモ版アリ 郵送2週間/ショールームならすぐ

8 無料お試し申し込み済み

9 Schedule

10 Mike: Station-1 terminal Install, South Spacer

11 Re-connect South Optical Fiber Cables & Check Threshold test South St-3, Oct-7, Brd-1 Toggle Switch OASys N2 Camera Debugging South Camera Check Light Source Mount w/ spacer Recap Clamp Install to North St-3 Re-connect South Optical Fiber Cables & Check Threshold test South St-3, Oct-7, Brd-1 Toggle Switch OASys N2 Camera Debugging South Camera Check Light Source Mount w/ spacer Recap Clamp Install to North St-3

12 November

13 December