7/8/20161 Pixel detector status and infrastructures Pixel detector status and infrastructures G. Bolla.

Similar presentations


Presentation on theme: "7/8/20161 Pixel detector status and infrastructures Pixel detector status and infrastructures G. Bolla."— Presentation transcript:

1 7/8/20161 Pixel detector status and infrastructures Pixel detector status and infrastructures G. Bolla

2 Pixel detector status 7/8/20162Gino Bolla Tracker day Same as last meeting! (Skip the next two slides) BUT There is a new problem in FPIX: Started last Friday. It involves up to 5 ROGs. It is recoverable with a configuration. Mauro is following up and will present a few slides after me. (I better be quick)

3 Pixel detector status (FPIX) 7/8/20163Gino Bolla Tracker day Since Re-installation Newly developed The newly developed problems are all of the same kind and on the same readout group. There is a dedicated presentation toward the end of the meeting. BPIX at 97% during CRAFT 09

4 Pixel detector status (BPIX) 7/8/20164Gino Bolla Tracker day Since Re-installation Newly developed BPIX at 99% during CRAFT 09 The newly developed problem is likely to be solved by swapping the FED.

5 Pixel cooling 7/8/20165Gino Bolla Tracker day Running stable at target Temperature (4 deg C) since last Thursday. Work during the shutdown: Inserted the new quadrelli ( Interface between actuators and valves ) for long term reliability) Added position sensors on critical Valves (reliability). Improved/deployed/tested new PLC code (Automation of manual procedures) Came back after 16 days OFF without any special action (Just turn ON) Change the mech. Interface between actuators and valves. Flowmeter in pixel-loop-2 (BPIX) is reading with bigger noise and offset. Paola and EN-CV are investigating (Strip works has priority) Still to do: Exchange the filters in the cooling plant (they are now missing the gaskets) Evaluate the results of the chemical analysis of the fluid sample.

6 FLOW-meter misbehaving 7/8/20166Gino Bolla Tracker day NowBefore

7 Other work during September shutdown 7/8/20167Gino Bolla Tracker day Taken data at about 6% humidity for a couple of days for HMX calibrations. Changed filters in the racks cooling circuits Cleaned Heat Exchangers in the Racks. Exchanged turbines in the CAEN Racks.

8 Pixel maintenance place at P5 7/8/20168Gino Bolla Tracker day I attended this meeting on September 15 th. I posted to tech-coord our general specifications. (Thx to Mauro, Pasquale etc… for helping me out) Nothing is moving. Austin is still trying to understand what can actually be done with the buildings at P5 (French authorities involved). It is not yet clear what is the general plan of Austin. The “Crystal room” might not end up to be our place. There might be a bigger clean room to accommodate Pixel BCM Pre-shower

9 Important dates in the near future: 7/8/20169Gino Bolla Tracker day Today (in parallel) Tech-coord review of handout to central DCS. http://indico.cern.ch/conferenceDisplay.py?confId=68966 October 13 th TSS (Tracker safety System) review This includes our response to power cuts etc… October 20 th (to be confirmed) TK Operation procedures with beams and general Tracker Operation Procedures.

10 Cooling work during September 7/8/201610Gino Bolla Tracker day


Download ppt "7/8/20161 Pixel detector status and infrastructures Pixel detector status and infrastructures G. Bolla."