MOL Mission Operations Laboratory MOL Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Increment 12 On-Orbit Operations Summary (OOS) Status Lori Manis EO10/Planning, Operations, and Analysis Branch (256) 544-2942 lori.manis@nasa.gov
2
MOL Mission Operations Laboratory Page 2 NASA MSFC Engineering Directorate Huntsville, Alabama Agenda Stage Utilization Assumptions Stage Utilization Overview Issues/Concerns Product Schedule Contacts
3
MOL Mission Operations Laboratory Page 3 NASA MSFC Engineering Directorate Huntsville, Alabama Stage Utilization Assumptions Since we have just begun the iURC coordination phase with the PDs, we do not have an OOS Overview (one- pager) at this time The following spreadsheet documents payloads, contained in CR9274 - IDRD Annex 5, Increment 12 Payload Tactical Plan, that will operate during this increment X’s in the stage column represent timeframe of ops not number of performances Crew time is an estimate based on tactical planning and/or past operations Minimize payload operations in Stage 12A.1 to mandatory science Spreadsheet includes potential payloads rolling over from Increment 11
4
MOL Mission Operations Laboratory Page 4 NASA MSFC Engineering Directorate Huntsville, Alabama Stage Utilization Overview
5
MOL Mission Operations Laboratory Page 5 NASA MSFC Engineering Directorate Huntsville, Alabama Stage Utilization Overview (Cont.)
6
MOL Mission Operations Laboratory Page 6 NASA MSFC Engineering Directorate Huntsville, Alabama Issues/Concerns Stage 12A.1 Crew Time Currently, the IDRD has 0 hours of crew time allocated to payloads in this stage. We need ~ 16 hours to accommodate our mandatory science (Renal Stone, GASMAP Healthcheck, Journals, SWAB, and MISSE PEC 5 Shutdown). If time is not available for dewar cleanup, MELFI may remain powered during this stage. Power Availability Due to EPS configurations changes, Channels 2B and 4B will experience power interruptions during Flights 12A and 12A.1. We need power management plans to minimize impact of outages on utilization (MELFI, TROPI, POEMS). MSG Seal Replacement Seals must be replaced before PromISS can operate in the 20P stage.
7
MOL Mission Operations Laboratory Page 7 NASA MSFC Engineering Directorate Huntsville, Alabama Product Schedule iURC Internal Cadre Review: 4/13 – 4/25 iURC Coordination w/ PDs Complete: 4/27 iURC Promotions Complete, Software models and crew time rollups to PPMs: 5/6 iURC ECR Review: 5/20 – 6/3 Preliminary OOS Integration TIM in Moscow: 6/20 – 7/1 Gr&Cs ECR & PL OOS Review: 7/20 – 8/3 Final OOS Integration TIM in Houston: 8/15 – 8/26 Integrated OOS delivered: 8/30 EPAS Deliveries Flight 12A: Preliminary – 5/9, Baseline – 9/8 Flight 12A.1: Preliminary – 7/8, Baseline – 11/9
8
MOL Mission Operations Laboratory Page 8 NASA MSFC Engineering Directorate Huntsville, Alabama Increment 12 Contacts If you have any questions concerning the planning products for Increment 12, please contact: Lori Manis – Lead (256) 544-2942 lori.manis@nasa.gov Jim Reaves (256) 961-4926 james.e.reaves@msfc.nasa.gov Ted Mavrotheris (256) 961-1291 ted.n.mavrotheris@msfc.nasa.gov