Needham Town Hall Feasibility Study Cover & Credits Prepared for: Needham Town Hall Feasibility Study Committee Permanent Public Building Committee John P. Connelly, Chairman PPBC Kate Fitzpatrick, Town Manager Jack Cogswell, Board of Selectmen Steven Popper, Director of Construction
2
Needham Town Hall Feasibility Study South Elevation
3
Needham Town Hall Feasibility Study 1907 Historic Postcard - South Elevation
4
Needham Town Hall Feasibility Study Historic Fabric - Lower Level Plan
5
Needham Town Hall Feasibility Study Historic Fabric - First Floor Plan
6
Needham Town Hall Feasibility Study Historic Fabric - Second Floor Plan
7
Needham Town Hall Feasibility Study Top Half of Auditorium Current Appearance of Second Floor Offices which Occupy the Auditorium Second Floor Copy Room 1911 Needham Bicentennial Banquet
8
Needham Town Hall Feasibility Study Balcony Level Storage Room Board of Selectmen’s Meeting Room, Looking East to New Wall Entrance to Board of Selectmen’s Meeting Room Stairway from Second Floor to Balcony
9
Needham Town Hall Feasibility Study Lower Level Main Corridor Training Room and Town Clerk StorageMail Room First Floor Main Corridor
10
Needham Town Hall Feasibility Study Existing South Entrance
11
Needham Town Hall Feasibility Study Existing East Entrance
12
Needham Town Hall Feasibility Study Existing West Entrance
13
Needham Town Hall Feasibility Study Existing Service Entrance
14
Needham Town Hall Feasibility Study Existing Site Plan
15
Needham Town Hall Feasibility Study Existing Lower Level Plan
16
Needham Town Hall Feasibility Study Existing First Floor Plan
17
Needham Town Hall Feasibility Study Existing Second Floor Plan
18
Needham Town Hall Feasibility Study Existing Balcony Floor Plan
19
Needham Town Hall Feasibility Study Description of Preliminary Design Alternates
20
Needham Town Hall Feasibility Study Existing South Elevation Proposed South Elevation
21
Needham Town Hall Feasibility Study Newburyport City Hall
22
Needham Town Hall Feasibility Study Groton Town Hall
23
Needham Town Hall Feasibility Study Alternate One - Site Plan
24
Needham Town Hall Feasibility Study Alternate One - Lower Level Plan
25
Needham Town Hall Feasibility Study Alternate One - First Floor Plan
26
Needham Town Hall Feasibility Study Alternate One - Second Floor Plan
27
Needham Town Hall Feasibility Study Alternate One - Balcony Floor Plan
28
Needham Town Hall Feasibility Study Alternate Two - Site Plan
29
Needham Town Hall Feasibility Study Alternate Two - Lower Level Plan
30
Needham Town Hall Feasibility Study Alternate Two - First Floor Plan
31
Needham Town Hall Feasibility Study Alternate Two - Second Floor Plan
32
Needham Town Hall Feasibility Study Alternate Two - Third Floor Plan
33
Needham Town Hall Feasibility Study Alternate Three - Site Plan
34
Needham Town Hall Feasibility Study Alternate Three - Lower Level Plan
35
Needham Town Hall Feasibility Study Alternate Three - First Floor Plan
36
Needham Town Hall Feasibility Study Alternate Three - Second Floor Plan
37
Needham Town Hall Feasibility Study Alternate Three - Balcony Floor Plan
38
Needham Town Hall Feasibility Study 1911 - Town Hall Decorated for Needham Bicentennial
39
Needham Town Hall Feasibility Study Cover & Credits Prepared for: Needham Town Hall Feasibility Study Committee Permanent Public Building Committee John P. Connelly, Chairman PPBC Kate Fitzpatrick, Town Manager Jack Cogswell, Board of Selectmen Steven Popper, Director of Construction