Presentation is loading. Please wait.

Presentation is loading. Please wait.

SGC × AUB L6 INTERIM PRESENTATION 23 MARCH 2016 JANE LEE.

Similar presentations


Presentation on theme: "SGC × AUB L6 INTERIM PRESENTATION 23 MARCH 2016 JANE LEE."— Presentation transcript:

1 SGC × AUB L6 INTERIM PRESENTATION 23 MARCH 2016 JANE LEE

2 CLIENT SGC Oxford BRIEF Newer ways of public engagement RESPONSE Interactive sculpture WHY?

3 1:1 WORKING COMPONENT Exhibition in Oxford (19 – 25 April) + Grad Show INFORMATIVE WEBSITE About the SGC and protein crystallography OUTCOMES

4

5

6 PROGRESS Structure Definition Site Visit Exhibition Proposal Wiring Prototype Materials & Components

7 STRUCTURE DEFINITION

8 SITE VISIT

9 EXHIBITION PROPOSAL

10 WIRING

11 PROTOTYPE

12 MATERIALS & COMPONENTS

13 WHAT’S LEFT Website Arduino/Programming Construction Detailing 3D Printing Construction

14


Download ppt "SGC × AUB L6 INTERIM PRESENTATION 23 MARCH 2016 JANE LEE."

Similar presentations


Ads by Google