Download presentation
Presentation is loading. Please wait.
Published byAlexandra Allen Modified over 8 years ago
1
FP6 and research infrastructures Main instruments Integrated infrastructure initiative (I3), several M€/year, 4-5 years communication network development, 300 M€ for GEANT and grids design studies, 1-10 M€, 2-4 years contribution to capital costs of new infrastructures, 10% max, 5-15 M€, lump sum
2
Vision for European radio astronomy 2001-2010 Maintain EVN at state-of-the-art Maintain national facilities at state-of-the-art; training grounds for young astronomers and engineers Upgrade EVN to e-EVN; links to China, SA, US, Japan essential Upgrade MERLIN to e-MERLIN for stand-alone and joint with e-EVN observations Develop and operate new, predominantly regional or national radio telescopes: LOFAR (NL, DE, SE), SRT-64 (IT), Yebes- 40 (ES) Develop and operate new global telescopes: ALMA, SKA
3
Integrated Infrastructure Initiative: networking activities management of the network develop synergies and complementary capabilities prototype ALMA regional support centre? incorporate CRAF meetings and workshops organisation of radio astronomy in Europe (Foresight Study)
4
I3: Trans-national access - continue access program for EVN - introduce access to individual major radio astronomy facilities operating as stand-alone instruments (eligibility: annual operating costs > 0.5 M€) MERLIN, Effelsberg IRAM, JCMT Yebes, Nancay WSRT, SEST
5
I3: Joint Research Activities Joint research activities, RTD, to enhance access through improvement of the infrastructure calibration and imaging software for high sensitivity astronomy receiver development (components+systems, software, bolometer arrays) for IRAM, Onsala, Metsahovi, Yebes, APEX, ALMA, SRT, EVN new digital technologies: phased arrays in the focal plane, digital BBCs, new correlator RFI mitigation
6
Communication network development in conjunction with IST thematic priority includes use of GEANT for specific high performance grids and testbeds I3 for e-EVN (together with GEANT, BT?, ….) -Networking activities (EVN) -Joint Research Project
7
Design studies feasibility studies+ technical preparatory work for a new infrastructure (1-10 M€) need clear European dimension and interest explore sources of finance for infrastructure eg EIB, Structural Funds SKA- technical and engineering development towards a 1% demonstrator - software development for simulations - cosmology ALMA – band 1 (0.5 M€)
8
Contribution to capital costs for development of new infrastructure which is already funded EC max of 10% of total budget for the infrastructure to catalyse construction for development of technically advanced elements of the future infrastructure, eg instrumentation, connectivity, not buildings, logistics e-MERLIN
10
I3: Networking activities management - management will be significantly more autonomous than in FP5 - scientific and financial coordination; generation of reports; cost statements; monitor impact of I3 activities - will need to employ people specifically to manage the contract
11
I3: Networking activities develop synergies and complementary capabilities procedures for applying for observing time; proposal deadlines level of service to users coordinated use of major infrastructures e.g. EVN + MERLIN national radio telescopes instrumental and software developments
12
I3: Networking activities Meetings and workshops formal meetings of partners activity coordination meetings symposia, schools outreach Round Table meetings with other astronomy I3’s
13
I3: Networking activities Organisation of radio astronomy in Europe (Foresight Study) - transform I3 into European Council for Radio Astronomy - “centre for European Interferometry at radio wavelengths”? ALMA, e-MERLIN, e-EVN, LOFAR, SKA
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.