Download presentation
Presentation is loading. Please wait.
Published byCecilia Amber Conley Modified over 8 years ago
2
Statistics 2015 Fixed Target CT/MTE and LHC BRIGHTNESS Eric Veyrunes, Johan Dalla-Costa, Diego Perez
3
SUMMARY BEAM TRANSMISSION CT vs MTE Applications Results CT Results MTE LHC BEAM BRIGHTNESS Definition Wire scan reliability Data from TIMBER CONCLUSION 11.02.16Extended SPS meeting - E. VEYRUNES
4
SUMMARY 11.02.16Extended SPS meeting - E. VEYRUNES
5
Beam transmission Applications SPS-FT : BCT3 at Flat Top (BCT4, if < 7000*10e8 p). PS-ext(x) : PS DC-BCT before extraction, x injection. PSB-ext(x) : DC-BCT before extraction with the sum of all rings. Transmission (%) = 100 * (SPS-FT /(PS-ext1 + PS-ext2)) 11.02.16Extended SPS meeting - E. VEYRUNES
6
Beam transmission Applications SPS-FT : BCT3 at Flat Top (BCT4, if < 7000*10e8 p). PS-ext(x) : PS DC-BCT before extraction, x injection. PSB-ext(x) : DC-BCT before extraction with the sum of all rings. Transmission (%) = 100 * (SPS-FT /(PS-ext1 + PS-ext2)) 11.02.16Extended SPS meeting - E. VEYRUNES
7
Beam transmission Applications SPS-FT : BCT3 at Flat Top (BCT4, if < 7000*10e8 p). PS-ext(x) : PS DC-BCT before extraction, x injection. PSB-ext(x) : DC-BCT before extraction with the sum of all rings. Transmission (%) = 100 * (SPS-FT /(PS-ext1 + PS-ext2)) LOGGING >SPS >Statistics >App Calculations (Start October 15) 11.02.16Extended SPS meeting - E. VEYRUNES
8
Beam transmission CT from application 11.02.16Extended SPS meeting - E. VEYRUNES From 15/10/16 to 17/10/16 TRANSMISSION%TRANSMISSION% Intensity
9
Beam transmission CT from application From 15/10/16 to 17/10/16 PS 88% PSB 84% 11.02.16Extended SPS meeting - E. VEYRUNES TRANSMISSION%TRANSMISSION% Intensity
10
Beam transmission CT from Larger 11.02.16Extended SPS meeting - E. VEYRUNES
11
Beam transmission MTE from application 11.02.16Extended SPS meeting - E. VEYRUNES From 13/10/16 to 15/11/16 TRANSMISSION%TRANSMISSION% Intensity
12
Beam transmission MTE from application PS 92% PSB 88% 11.02.16Extended SPS meeting - E. VEYRUNES From 13/10/16 to 15/11/16 TRANSMISSION%TRANSMISSION% Intensity
13
Beam transmission MTE from application PS 86% PSB 83% 11.02.16Extended SPS meeting - E. VEYRUNES From 13/10/16 to 15/11/16 TRANSMISSION%TRANSMISSION% Intensity
14
Beam transmission MTE from Larger 11.02.16Extended SPS meeting - E. VEYRUNES
15
SUMMARY 11.02.16Extended SPS meeting - E. VEYRUNES
16
LHC BEAM BRIGHTNESS Definition (from BE-CO) (Bunch Intensity H + Bunch Intensity V) = −−−−−−−−−−−−−−−−−−−−−−−− (Emittance Normalized H + Emittance Normalized V) Where all the values represent average data from 24 hours up to ramp start. From TIMBER we use the following signals which correspond to the given formula above: SPS%H_ROT%IN:EMITTANCE% SPS%V_ROT%IN:EMITTANCE% SPS%H_ROT%IN:BUNCH_INT SPS%V_ROT%IN:BUNCH_INT 11.02.16Extended SPS meeting - E. VEYRUNES
17
LHC BEAM BRIGHTNESS from acc-stats website 11.02.16Extended SPS meeting - E. VEYRUNES
18
LHC BEAM BRIGHTNESS Wire scan reliability 11.02.16Extended SPS meeting - E. VEYRUNES Courtesy V. Kain
19
LHC BEAM BRIGHTNESS Wire scan reliability 11.02.16Extended SPS meeting - E. VEYRUNES Courtesy V. Kain
20
LHC BEAM BRIGHTNESS Emittances 11.02.16Extended SPS meeting - E. VEYRUNES Protons runIons run
21
LHC BEAM BRIGHTNESS Intensities 11.02.16Extended SPS meeting - E. VEYRUNES Protons runIons run
22
LHC BEAM BRIGHTNESS BRIGHTNESS 11.02.16Extended SPS meeting - E. VEYRUNES Protons runIons run
23
From Verena’s presentation HL-LHC Day 2015 11.02.16Extended SPS meeting - E. VEYRUNES
24
From Verena’s presentation Chamonix 2016 11.02.16Extended SPS meeting - E. VEYRUNES
25
SUMMARY 11.02.16Extended SPS meeting - E. VEYRUNES
26
CONCLUSION More statistics on MTE Wire scan reliability will be optimized during 2016 Brightness calculation to be better evaluated in 2016 11.02.16Extended SPS meeting - E. VEYRUNES
27
Thanks for your attention 11.02.16Extended SPS meeting - E. VEYRUNES
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.