The Groves Phase II ALR10AT51 Operated by: Foley Grove, LLC 2/24/15 Baldwin County Taken by: D. Denson
2
2 Drainage ditch to pond/basin not stabilized and/or protected. Pipe collar not protected. Sediment observed in drainage ditch.
3
3 Drainage ditch slopes to pond/basin not stabilized and/or protected. Pipe collar not protected. Sediment observed in drainage ditch and in pipe.
4
4 Clearing phase.
5
5 Drainage ditch slopes to pond/basin not stabilized and/or protected. Sediment observed in drainage ditch.
6
6 Construction entrance/exit to site over drainage ditch to pond/basin not fully protected. Pipe collars not protected.
7
7
8
8
9
9 Clearing phase.
10
10 Clearing phase.
11
11 Pond/basin slopes not fully protected. Vegetation not maintained.
12
12 Discharge point.
13
13 Clearing phase.
14
14 Vegetative buffer.
15
15 Vegetative buffer from canal/drainage ditch located right of this photo.
16
16 Clearing phase.
17
17 Vegetative buffer from canal/drainage ditch located right of this photo.
18
18 Clearing phase.