Download presentation
Presentation is loading. Please wait.
2
www.ncrr.com@NCRailroad
3
www.ncrr.com@NCRailroad WHO WE ARE 3
4
www.ncrr.com@NCRailroad NCRR INVESTS We will evaluate requests for NCRR investments in, but not limited to: – Engineering & design costs – Lead, siding and other tracks – Site Grading & Drainage – Rail Roadbed Construction – Railroad Signals – Rail loading facilities (transload, team track, etc.) – Rights-of-way identification 4
5
www.ncrr.com@NCRailroad NCRR INVESTS Factors weighed: – New job creation – Average wage of new jobs – Capital Investment – A company’s anticipated rail use – Competition – extent to which a company is considering locations outside north Carolina – Project location: ON or OFF the NCRR Corridor 5
6
www.ncrr.com@NCRailroad NCRR INVESTS 6
7
www.ncrr.com@NCRailroad NCRR INVESTS Information needed: PROJECT PARAMETERS – Jobs, Investment, timeline, company background, etc. the same information you would use to present to your commissioners, councils, or boards. RAIL LAYOUT – an aerial image of how the rail would be laid out on the site ESTIMATE OF RAIL COSTS – an estimate either from a rail provider or engineering firm (that a rail provider has approved) 7
8
www.ncrr.com@NCRailroad NCRR INVESTS 8
9
www.ncrr.com @NCRailroad Anna Lea Moore Vice President – Economic Development annamoore@ncrr.com NC Rail Forum: April 18 th – 19th
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.