Construction and Transportation Update Bayside Demo: ▸ Cut and capped utilities ▸ Demolished appendage building on the waterfront ▸ Demolition continues, areas with non-regulated material coming down from the inside ▸ Next more abatement, including some exterior walls with DEP approval
2
Construction and Transportation Update Hubway ▸ Returning this week on the campus-side of the ISC below the Catwalk Garage/Athletics/Public Safety ▸ Finishing up drilled geotechnical borings to gather info for design/construction University Hall ▸ Phased opening continues throughout this semester – Chemistry moves begin this month for summer classes ▸ Final exams planned in classrooms ▸ Finish construction work and AV in 500-person auditorium, theatre, recital hall and TEAL classroom Healey Library Phase II ▸ Final and punchlist work - window installation
3
Utility Corridor and Roadway Relocation Project UCRR: ▸ Continue working in substructures of buildings ▸ Sequencing of utility installation work continues: ▸ Calf Pasture Pumping Station near Lot D (short term soil management plan area) ▸ DEP expanding short term area to University Drive South, Bianculli ▸ Installation of shallow utilities ▸ Curbs ▸ Trees www.umb.eduwww.umb.edu - Construction Update, App or Getting Here
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.