Download presentation
Presentation is loading. Please wait.
Published byChester Adams Modified over 8 years ago
1
Update on Student Housing College Senate May 6, 2016
2
Residence Hall Occupancy by Class Year: First Year Students:40% Sophomore Students:35% Junior Students:16% Senior Students: 9% Residency Requirement: – All full-time students are required to live on campus until they have earned junior-level standing (completion of 60 credits). Students who are married, single parents, veterans, transfer students, age 21 or older, or commuting from the home of a parent(s) or relative (aunt, uncle, brother, sister, etc.) within a 35-mile radius of the Buffalo State campus are exempt from this policy.
3
First Year Student Occupancy Summary: 2015/2016 Bed Availability: – (Porter, Perry, Neumann, NorthWing, Cassety*) 864 Beds (without triples) 1263 Beds (with triples) 2016/2017 Bed Availability: – (Porter, Perry, Neumann, NorthWing, Cassety**) 937 Beds (without triples) 1363 Beds (with triples) First Year Residence Hall Opening Occupancy: – 2011 – 2013 (3 Year Average) 821 – 2014 (Actual)1148 – 2015 (Actual)1280 – 2016 (Projected)1344 * Cassety Hall F/Y and Returning Student Housing ** Cassety Hall F/Y Housing Only
4
Returning Student Housing Cancellations: – Room Selection to Fall Residence Hall Opening: 2011 – 2013 Average # Cancellations:232 2014 - 2015 Average # Cancellations:364 – Registration Requirement Review Enacted
5
Occupancy Management – 2016/2017 First Year Housing: - Three Person Rooms Continue - Cassety Hall Converted to All First Year Housing Sophomore Student Housing: - Tower 1 – “Sophomore Experience” International Student Housing: - Dedicated Housing for First Time Students Returning Students: - Lottery Based Room Selection Transfer Students: - Off Site Housing – Medaille College and Canisius College
6
Occupancy Management – 2016/2017 Room Selection Priority Revision: #1 - Current First Year (Rising Sophomore) #2 - Current Sophomore (Rising Junior) #3 - Current Junior (Rising Senior) Requirements to Maintain Room Assignment – (June 1, 2016): – President Cabinet Review and Approval Room Deposit Payment All Returning Students Registered for Fall 2016 Classes (minimum 12 credits) Room Assignment cancelled if student does not comply with requirements
7
SUNY Buffalo State Housing Master Plan Bishop Hall Conversion to First Year Housing
8
Bishop Hall Renovation: Consultants:Mach Architecture Project Cost:$16.1 Million Design Start Date:February 2016 Occupancy Date:August 2018
9
Renovation Highlights: Bed Count – 207 Beds Project Scope: - MEP System Replacements - Architectural Improvements - Bathroom Enhancements (Single User) - Exterior Façade Enhancements - Amenity Spaces All Floors - Connection to Exterior Quad
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.