Download presentation
Presentation is loading. Please wait.
Published byRalf Bridges Modified over 8 years ago
1
AIM HIGH FLY FIGHT WIN B ASE C IVIL E NGINEER O UTLOOK Amir Mott, R.A., Chief, Project Execution Wright-Patterson AFB, OH (937) 904-0987
2
AIM HIGH FLY FIGHT WIN A GENDA Base Overview Organization Structure Construction Programs – MILCON – Operations and Maintenance (O&M) Design Awards
3
AIM HIGH FLY FIGHT WIN Land Area8,145 Acres Buildings17.2M SQ FT 604 Facilities Housing 100 Units 1536 Privatized Units Paved Roads128 Miles Airfield Pavements433 Acres 12,600 FT runway Utilities1,200 miles of mains Work Force27,000 Military/Civilian/Contractor B ASE O VERVIEW - S TATISTICS
4
AIM HIGH FLY FIGHT WIN Air Force Research Laboratory Air Force Institute of Technology National Museum of the USAF Air Force Materiel Command National Air & Space Intelligence Center 445 th Airlift Wing Wright-Patterson AFB Tenants Air Force Life Cycle Management Center (AFLCMC) 70+ Tenant Organizations
5
AIM HIGH FLY FIGHT WIN Colonel John M. Devillier Organization Structure 88 th Air Base Wing Wing Staff Civil Eng Group Mission Support Group 88th Air Base Wing Ops Support Squadron Medical Group Comptroller Squadron Comm Group
6
AIM HIGH FLY FIGHT WIN Mr. David Perkins 88th Civil Engineer Group Installation Mgt Division 788 th Civil Engineer Squadron 88th Civil Engineer Squadron Engineering Division Organization Structure 88 th Civil Engineer Group
7
AIM HIGH FLY FIGHT WIN C ONSTRUCTION P ROGRAMS Military Construction (MILCON) Program – Congressional Line Item Appropriation – Primarily New Construction – Corps of Engineers Managed Operations & Maintenance (O&M) Program – Non-Project Specific Appropriation – Primarily Maintenance, Repair & Renovation – Air Force Managed
8
AIM HIGH FLY FIGHT WIN MILCON - E XECUTION T RENDS Declining MILCON Program Limited Congressional Inserts Information Technology Complex, Phase 1Conversion for Power Research Lab
9
AIM HIGH FLY FIGHT WIN C URRENT WPAFB MILCON FY11-15 Program – No Regular MILCON Projects – 1 Emergency Insert: FYProject DescriptionPA ($M) 14 NASIC – Foreign Materiel Exploitation Lab 29.5 FY16 Program – No Regular MILCON Projects – 1 Unspecified Minor Military Construction (UMMC) Project – 1 Defense Medical (Military Health Facilities) MILCON Project: FYProject DescriptionPA ($M) 16 Construct Satellite Pharmacy6.3 16UMMC- CE Maintenance Shop Life/Health/Safety 3.8
10
AIM HIGH FLY FIGHT WIN ProjectPA ($M) Fire/Crash Rescue Station5 - 10 Relocate Entry Control Point 26A 10 - 25 Add/Alter Entry Control Point 22B5 - 10 Add/Alter Entry Control Point 1B5 - 10 Add/Alter Entry Control Point 1A10 - 25 Information Technology Complex, Ph 225 - 50 Acquisition Management Complex50 - 100 Chapel Activity and Religious Center5 - 10 Intelligence Production Complex (NASIC)100 - 200 Human Performance Center Laboratory10 - 25 Research Laboratory (AFIT) 10 - 25 Consolidate Bionanotronics Research Center 10 - 25 F UTURE WPAFB MILCON
11
AIM HIGH FLY FIGHT WIN C ONSTRUCTION P ROGRAMS Military Construction (MILCON) Program – Congressional Line Item Appropriation – Primarily New Construction – Corps of Engineers Managed Operations & Maintenance (O&M) Program – Non-Project Specific Appropriation – Primarily Maintenance, Repair & Renovation – Air Force Managed
12
AIM HIGH FLY FIGHT WIN $ MILLION D ESIGN A CCOMPLISHMENT N ON -MILCON
13
AIM HIGH FLY FIGHT WIN O&M – A-E C ONTRACTS Currently 6 Ongoing Contracts – Mechanical/Electrical (3) – Civil/Structural (1) – Multi-Discipline (2) Current Limits – Five year contracts – Contract amount: $12M ea. – Contract cost per individual task is unlimited Status – “1” contract expires in 2016, “2” in 2017, and “1” each in 2018- 2020.
14
AIM HIGH FLY FIGHT WIN A-E C ONTRACT P ROCUREMENT Next call for design services in anticipated Fall 2016 (Mech/Elec and Multi-discipline) Advertisement – “Federal Business Opportunities” Website www.fedbizopps.gov Selection Limited to Responders – SF 330, Architect-Engineer Qualifications Selection Based on Weighted Total Score
15
AIM HIGH FLY FIGHT WIN A-E C ONTRACT P ROCUREMENT Capability Package Tips – Show flexibility and wide experience of a variety of project types – Indicate who the project manager will be – If using consultants, show team’s experience – Respond to all evaluation factors listed in solicitation – Briefly support SF 330 with additional information Recommend photographs
16
AIM HIGH FLY FIGHT WIN N ON -MILCON C ONSTRUCTION $ MILLION
17
AIM HIGH FLY FIGHT WIN O&M - C ONSTRUCTION C ONTRACTS On-Call Contracts (IDIQ) SABER & CE Support Contracts Firm Fixed Price Contracts
18
AIM HIGH FLY FIGHT WIN O&M - O N -C ALL C ONTRACTS Pavements – One contract – Multiple year (5) – $4.9M – Expires: Dec 17 Airfield Pavement – One contract – Multiple year (3) – $4.5M – Expires: Dec 16 Roofing – One contract – Multiple year (3) – $4.9M – Expires: Jan 18
19
AIM HIGH FLY FIGHT WIN O&M - O N -C ALL C ONTRACTS Carpet Installation – One contract – Multiple year (5) – $7.5M – Expires: Nov 16 Furniture Maintenance – One contract – Multiple year (3) – $4.8M – Expires: Oct 17
20
AIM HIGH FLY FIGHT WIN O&M - O N -C ALL C ONTRACTS Emergency Spill Response – Two BPA’s – Multiple year (5) – $495K/BPA – Expires: Oct 2020 Laboratory Services – Two contracts (Hazardous Waste, Water, & Coal analysis) – Multiple years – Expires Jun 2020 (Hazardous Waste, Water) & Nov 2016 (Coal) Environmental Services – IDIQ A&E: expires Feb 2016 – Fence to Fence: expires Jun 2020 – Tank Maintenance: BPA expires Feb 2019 – Hazwaste Disposal: DLA expires Feb 2016 – Used Oil Pickup: BPA expires Mar 2017 – Infectious Waste Disposal: BPA expires Sep 2016
21
AIM HIGH FLY FIGHT WIN O&M - SABER & CE S UPPORT SABER – One contract – Multiple year (5) – $82.5M – Expires: Jun 16 CE Support Contract – One contract – Multiple year (5) – $49M – Expires: Dec 15 (extension and follow-on bridge contract up to 1 year) Multiple Award Construction Contract (MACC) – Eight Contracts – Multiple year (5) – $100M – Expires: Apr 20
22
AIM HIGH FLY FIGHT WIN O&M - F IRM F IXED P RICE C ONTRACTS Small Business Program – 8(a) Business – HUBZone – Service-Disabled Veteran-Owned Small Business – Women-Owned Small Business Full and Open – Advertised on Federal Business Opportunities Website
23
AIM HIGH FLY FIGHT WIN AFLCMC O FFICE OF S MALL B USINESS Contact the AFLCMC Office of Small Business at aflcmc.sb.org.mailbox@us.af.mil Dr. Mary Haley Director Ms. Jennifer Gallagher Enterprise Dr. Jeanette Robinson HI & AFSAC Ms. Julie Leavitt WI / WN / LP Ms. Angela Arnold WW / WK / WL Mr. Kent Morgan Operational & Services Operating Locations at: AFMETCAL, Eglin, Gunter, Hanscom, and Lackland
24
AIM HIGH FLY FIGHT WIN B USINESS R ESOURCES Federal Business Opportunities – https://www.fbo.gov/ https://www.fbo.gov/ Central Contractor Registration – http://www.sam.gov http://www.sam.gov
25
AIM HIGH FLY FIGHT WIN D ESIGN A WARDS – 2014 USAF Merit Award for Facility Renovations and Additions – Advanced Power & Thermal Research Laboratory Emersion Design
26
AIM HIGH FLY FIGHT WIN D ESIGN A WARDS – 2015 USAF Merit Award for Facility Renovations and Additions – 2 nd Floor Renovation, Building 20045 Luckett Farley
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.