Presentation is loading. Please wait.

Presentation is loading. Please wait.

ERCOT SYSTEM PLANNING Dynamic Model Data Management.

Similar presentations


Presentation on theme: "ERCOT SYSTEM PLANNING Dynamic Model Data Management."— Presentation transcript:

1 ERCOT SYSTEM PLANNING Dynamic Model Data Management

2 2 Current Process TSPs REsERCOT RARF DWG Annual Flat Start Case Build ? =?

3 3 Proposed Process Resource Entities (REs) submit all dynamic models and parameters through RARF to ERCOT. ERCOT will inform TSPs about the updated model and parameters. TSP and ERCOT will work with REs to resolve any concerns on the submitted model and parameters. ERCOT will be a single source to collect and compile all REs’ dynamic models and parameters and provide the data set to DWG for flat start base case creation.

4 4 Proposed Process: TSPs REsERCOT RARF DWG Flat Start Case Build Creation Periodic Updates Resolve model and parameter concerns

5 5 Draft of NERC MOD Standard MOD-026-1, MOD-027-1, MOD-025-2 These draft standards applies to Generator Owner and Transmission Planner Considering RARF is the adopted process in ERCOT region to collect all the model data, potential changes may be required in the future once these standards become effective

6 6 Potential changes: for NERC MOD-26-1, MOD-27-1 REs ERCOT RARF with accepted model and parameters DWG Flat Start Case Build Creation TP Updated Models and Parameters Acceptance Notification

7 7 Next Steps Discuss with DWG Pilot? DWG Procedure Manual Changes?


Download ppt "ERCOT SYSTEM PLANNING Dynamic Model Data Management."

Similar presentations


Ads by Google