STATEMENT Welcome to the TG Mine and thank you for your help. We have a 5 person crew that was tagged in on the mine tag board. They were working an idle shift doing some roof bolting and clean-up work. One of the 5 listed on the tag board came outside and said that they had hit some roof joints that was emitting methane and low oxygen. He was able to get out of the mine but not sure about the status of the others. The mine officials have not been able to locate the missing miners. Stoppings have been damaged by equipment working on the Unit. The air to this unit is currently short circuited through a fresh air base set up in an outby crosscut. The fan is running and cannot be turned off, reversed or stalled. The Map Is Up To Date and copies will be supplied to you once you start your exploration process. All support staff and supplies are on the property waiting the outcome of your exploration. God speed and be careful.
2
WRITTEN INSTRUCTIONS Explore the entire mine if it can be done safely. Account for all missing miners. Report to Briefing Officer any dangerous roof joints so he or she can place them on the B.O. Map. Also the location of these joints shall be reported to the Fresh Air Base Superintendent. Team is limited to transporting only 2 build material from one team stop to another. Up-To-Date team maps are provided.
3
TEAM NO. ______ FIELD NO. ______ SCALE 1” = 10’ 2014 TG-PX Practice Problem BO D Hardened Room D Clock X X Battery Mine Phone Field & Briefing Officer Map
4
TEAM NO. ______ FIELD NO. ______ SCALE 1” = 10’ 2014 TG-PX Practice Problem BC BO D Hardened Room Doors Open D Clock X LC X Battery Mine Phone X X X X X X X 5.8 % CH4 1 PPM CO 19.2 % O2 Gas Coming From Roof Joint 5.3 % CH4 1 PPM CO 19.2 % O2 BC X X X X X X X X X X X X X X X X XX X X X X X X X Face Used SCSR Battery Drill Tool Bag Joy Continuous Miner Timbers Set Mine Phone Battery Phone Battery Coal Hauler 6 Timbers Jeffery Roof Bolter 4 Timbers Battery Hauler Coal Shovel Body Person Cribs Built Ladder B B B 4.2 % CH4 2 PPM CO 19.3 % O2 4.5 % CH4 0 PPM CO 19.5 % O2 6.0 % CH4 1 PPM CO 19.4 % O2 5.9 % CH4 1 PPM CO 19.4 % O2 4.9 % CH4 1 PPM CO 19.3 % O2 5.1 % CH4 1 PPM CO 19.6 % O2 BC Battery Scoop D D D D Door Closed Unsafe Rib Over Hanging Brow Conscious Live Person “Help get me out, bad cut on thigh” Water Knee Deep Water Knee Deep Water Hip Deep Body Placard (turn over to back side) X Lunch Bucket Hammer Roof Joint X X
5
Extent of Gas 2014 TG-PX Practice Problem BC BO D Hardened Room Doors Open D Clock X LC X Battery Mine Phone X X X X X X X 5.8 % CH4 1 PPM CO 19.2 % O2 Gas Coming From Roof Joint 5.3 % CH4 1 PPM CO 19.2 % O2 BC X X X X X X X X X X X X X X X X XX X X X X X X X Face Used SCSR Battery Drill Tool Bag Joy Continuous Miner Timbers Set Mine Phone Battery Phone Battery Coal Hauler 6 Timbers Jeffery Roof Bolter 4 Timbers Battery Hauler Coal Shovel Body Person Cribs Built Ladder B B B 4.2 % CH4 2 PPM CO 19.3 % O2 4.5 % CH4 0 PPM CO 19.5 % O2 6.0 % CH4 1 PPM CO 19.4 % O2 5.9 % CH4 1 PPM CO 19.4 % O2 4.9 % CH4 1 PPM CO 19.3 % O2 5.1 % CH4 1 PPM CO 19.6 % O2 BC Battery Scoop D D D D Door Closed Unsafe Rib Over Hanging Brow Conscious Live Person “Help get me out, bad cut on thigh” Water Knee Deep Water Knee Deep Water Hip Deep X Lunch Bucket Hammer Roof Joint X Body Placard (turn over to back side) X
6
Procedure 2014 TG-PX Practice Problem BC BO D Hardened Room Doors Open D Clock X LC X Battery Mine Phone X X X X X X X 5.8 % CH4 1 PPM CO 19.2 % O2 Gas Coming From Roof Joint 5.3 % CH4 1 PPM CO 19.2 % O2 BC X X X X X X X X X X X X X X X X XX X X X X X X X Face Used SCSR Battery Drill Tool Bag Joy Continuous Miner Timbers Set Mine Phone Battery Phone Battery Coal Hauler 6 Timbers Jeffery Roof Bolter 4 Timbers Battery Hauler Coal Shovel Body Person Cribs Built Ladder B B B 4.2 % CH4 2 PPM CO 19.3 % O2 4.5 % CH4 0 PPM CO 19.5 % O2 6.0 % CH4 1 PPM CO 19.4 % O2 5.9 % CH4 1 PPM CO 19.4 % O2 4.9 % CH4 1 PPM CO 19.3 % O2 5.1 % CH4 1 PPM CO 19.6 % O2 BC Battery Scoop D D D D Door Closed Unsafe Rib Over Hanging Brow Conscious Live Person “Help get me out, bad cut on thigh” Water Knee Deep Water Knee Deep Water Hip Deep X Lunch Bucket Hammer 1 7-8-9 6 5 4 2-3 7-8-9 10-11 12 Roof Joint X Body Placard (turn over to back side) X
7
First Ventilation 2014 TG-PX Practice Problem BC BO D Hardened Room Doors Closed D Clock X LC X Battery Mine Phone X X X X X X X 5.8 % CH4 1 PPM CO 19.2 % O2 CLEAR Gas Coming From Roof Joint 5.3 % CH4 1 PPM CO 19.2 % O2 CLEAR BC X X X X X X X X X X X X X X X X XX X X X X X X X Face Used SCSR Battery Drill Tool Bag Joy Continuous Miner Timbers Set Mine Phone Battery Phone Battery Coal Hauler 6 Timbers Jeffery Roof Bolter 4 Timbers Battery Hauler Coal Shovel Body Person Cribs Built Ladder B B B 4.2 % CH4 2 PPM CO 19.3 % O2 4.5 % CH4 0 PPM CO 19.5 % O2 CLEAR 6.0 % CH4 1 PPM CO 19.4 % O2 5.9 % CH4 1 PPM CO 19.4 % O2 4.9 % CH4 1 PPM CO 19.3 % O2 5.1 % CH4 1 PPM CO 19.6 % O2 BC Battery Scoop D D D D Door OPEN Door Closed Unsafe Rib Over Hanging Brow Conscious Live Person “Help get me out, bad cut on thigh” Water Knee Deep Water Knee Deep Water Hip Deep X Lunch Bucket Hammer BO cannot build this temporary stopping, otherwise low O2 will travel over his position Roof Joint X MOVED Body Placard (turn over to back side) X
8
Second Ventilation 2014 TG-PX Practice Problem BC BO D Hardened Room Doors Closed D Clock X LC X Battery Mine Phone X X X X X X X Gas Coming From Roof Joint BC X X X X X X X X X X X X X X X X XX X X X X X X X Face Used SCSR Battery Drill Tool Bag Joy Continuous Miner Timbers Set Mine Phone Battery Phone Battery Coal Hauler 6 Timbers Jeffery Roof Bolter 4 Timbers Battery Hauler Coal Shovel Body Person Cribs Built Ladder B B B 4.2 % CH4 2 PPM CO 19.3 % O2 6.0 % CH4 1 PPM CO 19.4 % O2 5.9 % CH4 1 PPM CO 19.4 % O2 4.9 % CH4 1 PPM CO 19.3 % O2 Clear 5.1 % CH4 1 PPM CO 19.6 % O2 BC Battery Scoop D D D D Door Closed Unsafe Rib Over Hanging Brow Conscious Live Person “Help get me out, bad cut on thigh” Water Knee Deep Water Knee Deep Water Hip Deep X Lunch Bucket Hammer Door Closed BO can only build this temporary stopping before line curtain is installed & back in hardened room before curtain is used Roof Joint X MOVED Body Placard (turn over to back side) X
9
Third Ventilation 2014 TG-PX Practice Problem BC BO D Hardened Room Doors Closed D Clock X LC X Battery Mine Phone X X X X X X X Gas Coming From Roof Joint BC X X X X X X X X X X X X X X X X XX X X X X X X X Face Used SCSR Battery Drill Tool Bag Joy Continuous Miner Timbers Set Mine Phone Battery Phone Battery Coal Hauler 6 Timbers Jeffery Roof Bolter 4 Timbers Battery Hauler Coal Shovel Body Person Cribs Built Ladder B B B 4.2 % CH4 2 PPM CO 19.3 % O2 6.0 % CH4 1 PPM CO 19.4 % O2 5.9 % CH4 1 PPM CO 19.4 % O2 CLEAR 5.1 % CH4 1 PPM CO 19.6 % O2 BC Battery Scoop D D D D Door Closed Unsafe Rib Over Hanging Brow Conscious Live Person “Help get me out, bad cut on thigh” TAKEN OUT Water Knee Deep Water Knee Deep Water Hip Deep X Lunch Bucket Hammer Door Closed BO can only build this temporary stopping before line curtain is installed & back in hardened room before curtain is used (QUITTER) FPA NO MAPPING OF BODY AND FACE TWO PEOPLE UNACCOUNTED FOR UNLESS TEAM TIMBERED INTO UNSAFE ROOF IN #1 EARLIER BEFORE GOING INTO BARRICADE IN #2 Roof Joint X Body Placard (turn over to back side) X Timber into before 3 rd ventilation to body