City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Type III Design Review LU 12-142348 DZ SW Yamhill, between 4 th and 5 th July 19, 2012
2
Zoning & Approval Criteria CXd : Central Commercial w/ Design Overlay Central City Fundamental Design Guidelines
3
SW College Street Project Summary Proposal includes a fully glazed 22’-6”-tall building with a 27’-6”-tall stone wall between existing and proposed New building partially sits atop new stone stairs, a portion of the stairs & associated handrails encroach into the SW Yamhill Street right-of-way North elevation includes 3 sets of double doors All mechanical will be incorporated into the existing building A new single story building for a portion of the developed block Existing 2-story building will be partially demolished Existing skybridge above SW Yamhill Street approved to be demolished
4
Site
5
SW College Street Vicinity - transit First
6
SW College Street SW 5th Avenue SW 4 th & Yamhill
7
SW College Street SW Yamhill
8
SW College Street SW 5th Avenue SW 5 th & Yamhill
9
SW 5th Avenue Looking down
10
SW 5th Avenue Site/Roof Plan
11
SW College Street SW 5th Avenue
12
Right-of-way
13
SW College Street Staff Recommendation BDS recommends approval for Design Review BES recommends approval for Special Circumstance request
14
North Elevation
15
SW 5th Avenue West Elevation
16
SW 5th Avenue East Elevation