WP4 April 2013 to March 2016 (Tim). WP4 Outline 1.Scope of UK Activity 2.How the UK work fits into the international programme 3.People involved, institutes,

Similar presentations


Presentation on theme: "WP4 April 2013 to March 2016 (Tim). WP4 Outline 1.Scope of UK Activity 2.How the UK work fits into the international programme 3.People involved, institutes,"— Presentation transcript:

1 WP4 April 2013 to March 2016 (Tim)

2 WP4 Outline 1.Scope of UK Activity 2.How the UK work fits into the international programme 3.People involved, institutes, resources, scale of effort 4.Schedule of work 5.Meetings 22/04/20132ATLAS Tracker Upgrade Kick-off Meeting

3 Scope of UK Activity Goal – The goal of WP4 is to finalize and validate the emerging stave core design and to establish the UK groups as having the skills and resources to constitute a major stave-building and module mounting centre for the build-phase of the ATLAS tracker upgrade. Deliverables – The main deliverables from this programme are a number of single and double-sided stavelet and full stave cores populated with thermal and full electrical modules to advance the development and performance verification of the stave core design. – The manufacturing procedures and test methods will be fully documented and form the basis of an initial set of formal stave assembly and QA procedures in the first phase of the construction programme. 22/04/20133ATLAS Tracker Upgrade Kick-off Meeting

4 WP4 Tasks 1.Tapes 2.Stave Core Development 3.Module Mounting & Wire-bonding 4.Stave QA 5.Production Preparation 22/04/20134ATLAS Tracker Upgrade Kick-off Meeting

5 Effort TaskTitleLeader AcApET Total FTE 4.1 Tapes Weidberg0.30 2.252.004.55 4.2 Stave Core Development Jones0.900.553.057.9612.46 4.3 Module Mounting Gibson01.150.952.254.35 4.4 Stave QA Beck1.204.503.951.5211.17 4.5 Production Prep McMahon0.550.300.650.912.41 Total 2.956.5010.8514.6534.95 22/04/20135ATLAS Tracker Upgrade Kick-off Meeting

6 22/04/2013ATLAS Tracker Upgrade Kick-off Meeting6 TaskNameRoleInstituteFundingY1Y2Y3Total 4.1 R. Wastie E Oxford CG1.000.750.50 Elec Tech T Oxford CG0.11 Mech Tech T Oxford CG0.04 Photofabrication T Oxford CG0.08 Elec Tech T Oxford NM0.21 Mech Tech T Oxford NM0.07 Photofabrication T Oxford NM0.16 T. Weidberg Ac Oxford CG0.10 Sub-total 1.771.521.274.55 TaskNameRoleInstituteFundingY1Y2Y3Total 4.2 Jones AP Liverpool CG0.20 0.15 Carroll JL E Liverpool CG0.200.10 Sutcliffe P E Liverpool CG0.150.050.00 Whitley M T Liverpool CG0.20 Mechanical Workshop T Liverpool CG0.06 0.08 Mechanical Workshop T Liverpool NM0.120.140.19 WPT-9 Technician T Liverpool NM0.000.50 G. Viehhauser Ac Oxford CG0.20 R. Nickerson Ac Oxford CG0.10 S. Yang E Oxford CG0.20 R. Makin E Oxford CG0.100.20 J. Lynn E Oxford CG0.400.300.20 Mech Tech T Oxford CG0.260.290.25 Elec Tech T Oxford CG0.19 0.04 Mech Tech T Oxford NM0.700.840.49 Elec Tech T Oxford NM0.140.160.07 Ian Mercer T Lancaster CG0.50 Paul Booker T TD 0.20 Richard French E Sheffield CG0.200.150.10 Sub-total 4.114.573.7812.46

7 22/04/2013ATLAS Tracker Upgrade Kick-off Meeting7 TaskNameRoleInstituteFundingY1Y2Y3Total 4.3 Jones AP Liverpool CG0.15 Carroll JL E Liverpool CG0.10 Muskett T Liverpool CG0.150.10 Whitley M T Liverpool CG0.10 Wormald MP T Liverpool CG0.050.10 Mechanical Workshop T Liverpool CG0.04 Mechanical Workshop T Liverpool NM0.08 WPT-9 Technician T Liverpool NM0.000.50 Martin Gibson AP PPD 0.20 0.30 Ivan Church E TD 0.250.150.25 Sub-total 1.121.521.724.35 TaskNameRoleInstituteFundingY1Y2Y3Total 4.4 Affolder A AP Liverpool CG0.10 Dervan P AP Liverpool CG0.00 0.10 Greenall A E Liverpool CG0.10 Jones AP Liverpool CG0.10 Sutcliffe P E Liverpool CG0.000.050.10 Mechanical Workshop T Liverpool CG0.000.04 Mechanical Workshop T Liverpool NM0.000.08 G. Viehhauser Ac Oxford CG0.20 J. Lynn E Oxford CG0.20 R. Wastie E Oxford CG0.000.250.50 Elec Tech T Oxford CG0.040.020.00 Mech Tech T Oxford CG0.040.07 Elec Tech T Oxford NM0.070.030.00 Mech Tech T Oxford NM0.070.14 Graham Beck AP QMUL CG0.30 RA QMUL NM0.000.50 Fred Gannaway E QMUL CG0.20 Jag Mistry T QMUL CG0.20 John Morris E QMUL Other0.20 Steve McMahon Ac PPD 0.000.30 Peter Phillips AP PPD 0.20 John Matheson AP PPD 0.20 Giulio Villani E PPD 0.10 Ivan Church E TD 0.250.150.25 Martin Gibson AP PPD 0.30 0.10 Sub-total 2.874.034.2811.17

8 22/04/2013ATLAS Tracker Upgrade Kick-off Meeting8 TaskNameRoleInstituteFundingY1Y2Y3Total 4.5 Jones AP Liverpool CG0.05 0.10 Carroll JL E Liverpool CG0.000.10 Whitley M T Liverpool CG0.00 0.10 Wormald MP T Liverpool CG0.00 0.05 Mechanical Workshop T Liverpool CG0.00 0.04 Mechanical Workshop T Liverpool NM0.00 0.08 G. Viehhauser Ac Oxford CG0.05 J. Lynn E Oxford CG0.000.100.20 Elec Tech T Oxford CG0.00 0.04 Mech Tech T Oxford CG0.00 0.18 Elec Tech T Oxford NM0.00 0.07 Mech Tech T Oxford NM0.00 0.35 Steve McMahon Ac PPD 0.000.20 Martin Gibson AP PPD 0.00 0.10 Richard French E Sheffield CG0.000.050.10 Sub-total 0.100.551.762.41

9 Financial Resources 22/04/20139ATLAS Tracker Upgrade Kick-off Meeting

10 Milestones & Deliverables Milestone / Deliverable Description Completion date DeliverableTask M4.1Draft stave thermo-mechanical and electrical performance requirements documentedQ3/2013D4.24.2/4.4 M4.2Delivery of prototype stave core for 130nm ASICsQ4/2013 4.2 M4.3Draft stave assembly and QA proceduresQ1/2014D4.34.4 D4.1Probing system for reception testing and stave life-cycle tape QAQ1/2014 4.1 D4.2Final stave thermo-mechanical and electrical performance requirements documentQ2/2014 4.4 M4.5Final stave core design frozenQ2/2014 4.2 D4.3Final stave assembly and QA procedures documentQ3/2014 4.2/4.4 M4.6First UK final prototype stave core completeQ4/2014 4.2 M4.7Delivery of prototype core with GBT and VLQ2/2015D4.44.2 M4.8Production plan for UK stave assemblyQ3/2015 4.5 D4.4Delivery of six thermo-mechanical and two electrical staves and associated QA reportQ1/2016 4.2/4.3/4.4 22/04/2013ATLAS Tracker Upgrade Kick-off Meeting10

11 WP4 Schedule 13/Q213/Q313/Q414/Q114/Q214/Q314/Q415/Q115/Q215/Q315/Q416/Q1 130nm stave design 130nm tooling development 130nm thermal cores m/f & evaluation 130nm stavelet cores 130nm electrical cores 130nm module mounting 130nm electrical evaluation Final stave core design Final stave core tooling development Pre-production stave core m/f & thermo-mechanical eval. Module mounting system development Pre-production module mounting &elec. evaluation Production planning & preparation 22/04/201311ATLAS Tracker Upgrade Kick-off Meeting

12 How the UK work fits into the international programme #1 Tapes – Responsibility for bus tape electrical layout (with WP3) – Low mass screen manufacturing capability (if screen required) – Future programme: Tapes for prototype thermo-mechanical and electrical staves (stavelets) Stave Core Development – Bulk of (active) technical resources within UK – UK-proposed titanium + orbital welding now adopted as baseline – UK-proposed single-edge mounting & locking now adopted as baseline – UK-proposed side-mounted EOS now adopted as baseline – Future programme: Defining final stave core geometry, optimising stave core thermal design & improving stave manufacture 22/04/201312ATLAS Tracker Upgrade Kick-off Meeting

13 How the UK work fits into the international programme #2 Module Mounting – UK-developed tooling is the only mass-manufacture, high accuracy module mounting system for ATLAS staves. – Current system (will be) used for Stave 250 – Future programme: Gain experience with RAL system on stave 250/130, establish feasibility of CMM-based system at Liverpool. Review in 3 rd year. Stave Core QA – New task aimed at bringing together all aspects of Stave QA. – Procedures & test systems required by other tasks to demonstrate functional performance – Development of QA procedures in collaboration with other teams. Production Preparation – Task has been severely de-scoped in cost-cutting to arrive at funded programme. – Focus is on defining understanding how the UK share of stave cores would be manufactured and itemising the infrastructure and estimating the effort required. 22/04/201313ATLAS Tracker Upgrade Kick-off Meeting

14 Meetings Traditionally... – Weekly ‘phone meeting at 10am on Monday – Face-to-face meetings at 4-6 week intervals Issues moving forward... – How to link with other WPs WP4 (shared pre-preg, foam, cooling tube, etc..) WP3 (stave electrical architecture, modules) WP5 (test systems, stave electrical QA, system test results evaluation) WP6 (Stave mechanical & services interfaces, sub-system assembly and test) – My proposal Keep weekly WP4 ‘phone meetings Keep frequency of F2F meetings but maybe alternate between – Strip Mechanics (WP4, WP6) – Strip staves (WP3, WP4, WP5, WP6) 22/04/201314ATLAS Tracker Upgrade Kick-off Meeting