Pre-Meeting Meeting Brian Drendel 5-14-07. Accelerator Shift Plot.

Similar presentations


Presentation on theme: "Pre-Meeting Meeting Brian Drendel 5-14-07. Accelerator Shift Plot."— Presentation transcript:

1 Pre-Meeting Meeting Brian Drendel 5-14-07

2 Accelerator Shift Plot

3 Users Shift Plot

4 Current Store Determine Store turn-around based on: – Decay Fit – Pbar Progress

5 Luminosity Decay Projections No store this morning….

6

7

8

9 Studies Requests Linac Booster No major Requests Main Injector  See separate page Pbar  Stacktail upgrade (see separate page)  AP2 orbit adjustments to mitigate losses at AP50  Mitigate stacktail heating of the core (very hard – next couple of weeks)  Improvements to the Debuncher Cooling Recycler  See Separate page. Tevatron  Continue to work operating point with chromatic sextupoles set to zero.  TEL1 beam-beam compensation.

10 Recycler Studies  Short Term  Compound bucket studies (Chandra, Sasha)  Diffusion Study – D. Broemmelsiek  Sequencer upgrades – C. Gattuso  Abort line study (protons) – Dave Johnson  Longer Term  R22 line dispersion function (Ming-Jen)  Mapping LAM222 fields (Ming-Jen)  Tuning at 190G in ECool cooling section (Sasha, Lionel)  Recycler Impedance measurement (Martin, Jim Crisp)

11 Main Injector Studies – Multibatch Slip Stacking Studies (2.5 second $2E) – Multibatch Slip Stacking to Pbar/NuMi Targets (2 Hrs.) – Barrier Bucket Stacking (2.5 second $2E ) – 150 Lattice Studies (3 second $2B) – Pbar Injection Damper measurements – Aperture Scans (0.5 second $2E) – MI-8 Collimator scans. – Multibatch Slip stacking to Pbar and NuMI. Unstable beam (2 hours). NuMI pushing for this.

12 Tevatron Sextupole Upgrade Phase 1 – Splitting the loops (done) Phase 2 – Running new Sextupoles loops at zero current Work continues…. Phase 3 – Flip polarities on chromatic sextupoles. This requires access time.

13 Pbar Stacking Upgrade Stacktail Leg 3 Implementation – Heats the core emittances. – Requires reasonable timeline – 5% hit on stacking. Accumulator Lattice – Six hours of Reverse Protons + Multiple hours of tune-up. Delta-Kickers – Measure and attempt to turn on delta-kickers. – Add Deibele filters to delta legs – Measurements (1+ hours with no stacking) New Equalizer – Mid-May

14 Accumulator Optics Optics Status – 628767/628840/628900Hz – 8cm dispersion too much? ½ of previous Valeri goal of <5cm Next Measurements/Study Period – Install next lattice (1hr) Measure dispersion on core orbit – make decision – core orbit lattice meas. – Admittance on central orbit (0.5hr)-- make decision Running Wave and correct on central orbit (1hr) Measure admittance on all 3 orbits (1.5hr) – Tunes across aperture (.5hr) – Re-check dispersion on core orbit (.5hr) -------------------------------------------------------- ------------ Next-Next studies – AP3 lattice (pbars; protons; pbars) – semiparasitic P143 calc and publish new lattice for P150 and P206 – Measure slip factor across aperture (rev proton, or leftover pbars) – Commission Deb TBT BPM for reverse protons D/A optics measurements Leave lattice in – Adjust parameters and software A:RCETA, (injection and deposition frequency) – Accllrf, P142, P153(?) P44 for chromaticity P51 for beta functions to calc dispersion P162 for beta function for fit of TBT rev protons P145 for accumulator orbit correction P148 setup of FFT window span & freq P207 file sharing value for eta- extraction P188 files (DVM will think about) Cooling delays (Valeri will calculate) Hard coded Sequencer & ACL scripts – Stack (tune for several shifts) Check Phasing (1hr) Center tanks (on-going) – Transfers (check efficiency and MI IPM) Pbar experts want to do this no later than tomorrow?

15 Accesses Linac Booster – Access to remove old 8GeV components (Multiple 4 hour accesses) Main Injector Recycler – None Pbar Tevatron – Access for Chromatic Sextupoles Polarity Flip (4-8 hours) – Cold Leak Check A1 (4 hour access) – More turbo station work (8 hour access)

16 Maintenance Linac – (8 Hrs) Adjust Drive Loop on stations 3 and 5: Effects penetrations! – Done: (4 Hr x1) Test new LLRF: Proof of principle experiment on station 5 – (4 Hr) Work on Debuncher Water skid – Started: (4 Hr x3) Alignment work for MTA line Booster Main Injector Recycler – New Dampers (still not working) Pbar Tevatron – A0 Kicker Room AC Unit (4 hours no Tevatron Beam)

17 Accelerator Conditions Linac Booster Pbar Recycler Main Injector Tevatron NuMI MiniBooNE SY120

18 Linac Status

19 Booster Status

20 MI8 Emittances

21 MI Pbar Efficiency

22

23

24 Recycler Check

25 Recycler Check 2

26 Recycler Pbar Transfer -Gattuso 26 r ACC to MI transfer eff for the last 400 shot setups  ACC to MI transfer eff for this last Weekend shot setups

27 Recycler Pbar Transfer -Gattuso 27 ACC to MI transfer eff for the last 400 shot setups  ACC to MI transfer eff for this last Weekend shot setups

28 Recycler Pbar Transfer -Gattuso 28 Pbar Core emits for the last ~900 shot setups…..  Acc to MI transfer eff for the last ~900 shot setups

29 MI NuMI Eff

30 NuMI

31 MiniBooNE

32

33 Tevatron Data Protons – P*Pbars vs Luminosity – Intensities – Transverse Emittances (soon) – Longitudinal (soon) – Tunes Pbars – Pbars vs Initial Luminosity – Intensities – Transverse Emittances – Longitudinal Emittances – Tunes

34

35 Protons

36

37

38

39 SVG Proton Intensities

40 SVG Proton Horizontal Emittances

41 SVG Proton Vertical Emittances

42 SVG Proton Longitudinal Emittances

43

44

45

46

47 Pbars

48

49

50 SVG Pbar Intensities

51 SVG Proton Horizontal Emittance

52 SVG Proton Vertical Emittance

53 SVG Pbar Longitudinal Emittance

54

55

56

57

58 tunes

59 FY’07 Integrated

60 Weekly Integrated


Download ppt "Pre-Meeting Meeting Brian Drendel 5-14-07. Accelerator Shift Plot."