Download presentation
Presentation is loading. Please wait.
Published byAdrian Bradford Modified over 8 years ago
1
In-Delta Storage Program Environmental Evaluations Stakeholders Committee Meeting January 22, 2003 Leslie Pierce
2
Updating the baseline dataUpdating the baseline data Key issues raised during the public comment periodKey issues raised during the public comment period Future stepsFuture steps OutlineOutline
3
Baseline data Surveys for the Delta Wetlands Project were done in the late 1980’s and early 1990’s Regulatory agencies requested updated surveys for all islands for the Re- engineered Delta Wetlands Project
4
Surveys conducted in 2002-2003 Botanical surveys –Interior of four islands –Channel sides of the levees –Surveyed for 16 special status plant species Wildlife surveys –Interior and levees of four islands –Surveyed for 2 reptiles, 16 birds, and 4 mammals Data evaluation is in progress
5
Ongoing work Fisheries –Started the Central Valley Fish Facilities Review Team review of the proposed fish screens for the integrated facilities –Begin discussing proposed Re-engineered DW Project operations with regulatory agencies
6
Public Comments Impacts to agricultural land –Conflicting comments –CALFED ROD –Quantifying impacts and will propose mitigation Cumulative and third party impacts –Will address during the Subsequent EIR/EIS if the agencies decide to continue with the project Operational and environmental benefits of the project
7
Future Steps Complete the Feasibility Study (state version) by June 2003 If the agencies decide to proceed further with the project, complete a draft Subsequent EIR/EIS by March 2004
8
Visit our website… http://www.isi.water.ca.gov/ssi/index.shtml
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.