Presentation is loading. Please wait.

Presentation is loading. Please wait.

Alignment Work for June 03, 2013 - June 07, 2013 Assignment Days Contact Task ManagerStarting DateEnding DateCrew Assigned Main Injector4.0 Days Work for.

Similar presentations


Presentation on theme: "Alignment Work for June 03, 2013 - June 07, 2013 Assignment Days Contact Task ManagerStarting DateEnding DateCrew Assigned Main Injector4.0 Days Work for."— Presentation transcript:

1 Alignment Work for June 03, 2013 - June 07, 2013 Assignment Days Contact Task ManagerStarting DateEnding DateCrew Assigned Main Injector4.0 Days Work for Cons ? 4 Days Cons Gattuso X6331 Babatunde OshinowoMay 27, 2013May 30, 2013Chuck Wilson, Crutcher, Teafoe Beam pipe alignment of Recycler line. Cons Gattuso X6331 Babatunde OshinowoMay 27, 2013May 30, 2013 Craig Bradford, Randy Wyatt, Mike O’Boyle Completed with Sink Hole repair at MI31/MI39. Backfill has been completed and graded in this area. We would like the filled area to be checked to see if more fill/grading needs to be added anyplace on this berm before we mat and seed. Cons Gattuso X6331 Babatunde OshinowoMay 27, 2013May 30, 2013 Craig Bradford, Randy Wyatt, Mike O’Boyle Measured site riser plug extension for concentricity with original plug. Found 0.107" off at bottom. M. Frett will try to repair and we will return in the a.m. to check. Completed alignment of differential pumping sections at 341 and 401. Set 341 as close as possible with upstream under vacuum. Will need bracket or vacuum let up to set closer. 401 4" pipe is within 1/4" with no way to adjust, no stand, no bellows. D0/TPC 2.0 Days Virgil BoceanMay 27, 2013May 30, 2013Chuck Wilson, Crutcher, Teafoe Upon gaining beneficial occupancy of the new LArTF building, we would like your group to come in and mark the positions on the floor of the H-size shielding blocks and also to mark the positions of all of the equipment 2 DaysVirgil BoceanMay 27, 2013May 30, 2013Chuck Wilson, Crutcher, Teafoe NML2.0 Days May 27, 2013May 30, 2013 Perform survey checks of the coupler, gate valve, RF Gun, cavity and check against the table's alignment. (There has been work completed around and on the RF Gun since it's alignment and this would let us know if anything has moved).1.5Virgil BoceanMay 27, 2013May 30, 2013Chuck Wilson, Crutcher, Teafoe Completed the as-found of STSS002,STSS001, SRF-GUN2, and the 9WayCross Table. This should complete the as-found of all components in this enclosure. On Going Completed On Going Completed All as found data collection Completed

2 Alignment Work for June 10, 2013 - June 14, 2013 Assignment Days Contact Task ManagerStarting DateEnding DateCrew Assigned Main Injector4.0 Days Work for Cons ? 4 Days Cons Gattuso X6331 Babatunde OshinowoJune 10, 2013June 14, 2013Chuck Wilson, Crutcher, Teafoe Beam pipe alignment of Recycler line. Cons Gattuso X6331 Babatunde OshinowoJune 10, 2013June 14, 2013 Craig Bradford, Randy Wyatt, Mike O’Boyle 8Gev line RR102 to 103 beam pipe alignment (Ready Tuesday) MI beam pipe upstream of Injection Lambertson Main injector RF 607-608 Beam pipe alignment/ as-found between BV607 and BV608 ( Ready Wednesday) Kickers at 307 (Ready Tuesday) MI beam pipe 305-307 ready (partially ready Thursday) RR30 straight section Kickers at 307 (Wednesday) Recycler Transfer line 302 -304 (Tuesday) Recycler beam pipe and components from Q229-301(ready Tuesday) Multi wires in transfer line 905,904,903 and 902 (ready Thursday) RR40 Differential pump sections 341 (ready Tuesday) Differential pump sections 341 and 401 beam pipe alignment (ready Wednesday) Two quads will in the section will need to move to insert pipe, once the pipe is inserted we’ll need to have them aligned. Cons Gattuso X6331 Babatunde OshinowoJune 10, 2013June 14, 2013 Craig Bradford, Randy Wyatt, Mike O’Boyle

3 Alignment Work for June 10, 2013 - June 14, 2013 Assignment Days Contact Task ManagerStarting DateEnding DateCrew Assigned D0/TPC 2.0 Days Virgil BoceanMay 27, 2013May 30, 2013Chuck Wilson, Crutcher, Teafoe Upon gaining beneficial occupancy of the new LArTF building, we would like your group to come in and mark the positions on the floor of the H-size shielding blocks and also to mark the positions of all of the equipment 2 DaysVirgil BoceanJune 10, 2013June 14, 2013Chuck Wilson, Crutcher, Teafoe NML2.0 Days June 10, 2013June 14, 2013 Perform survey checks of the coupler, gate valve, RF Gun, cavity and check against the table's alignment. (There has been work completed around and on the RF Gun since it's alignment and this would let us know if anything has moved).1.5Virgil BoceanJune 10, 2013June 14, 2013Chuck Wilson, Crutcher, Teafoe NOVA2.0 Days June 10, 2013June 14, 2013 Measure the height of movable access platform (MAP): bottom of MAP to secondary containment membrane on the floor at 5 locations where the MAP corresponds to the 5 catwalk support columns. See O'Sheg Oshinowfor details. June 10, 2013June 14, 2013 MP91.0 Days June 10, 2013June 14, 2013 Fiducialize and reference the CC1 cavity TB9RI029 and cold mass before insertion into CC1 vessel at MP9.June 10, 2013June 14, 2013 Align the CC1 cavity TB9RI029 and cold mass into the CC1 vacuum vessel at MP9.June 10, 2013June 14, 2013


Download ppt "Alignment Work for June 03, 2013 - June 07, 2013 Assignment Days Contact Task ManagerStarting DateEnding DateCrew Assigned Main Injector4.0 Days Work for."

Similar presentations


Ads by Google