Download presentation
Presentation is loading. Please wait.
Published byPatience Daniels Modified over 8 years ago
1
N. Baboi, DESY EuCARD SRF, HOM-Meeting, 4 th Quarter, Aug. 25, 2010 Task 5.1 BPM-HOM 4 th Quarter (Apr.-Sep. 2010) Activity this period Participation to conferences and schools Meetings Status of electronics design Outlook Nicoleta Baboi
2
N. Baboi, DESY EuCARD SRF, HOM-Meeting, 4 th Quarter, Aug. 25, 2010 Activity this Semester Work made in this period HOM measurements without beam in ACC39 in FLASH April full set of spectra, all combinations, 3 - 8GHz active participation of colleagues from Rostock HOM spectra with beam July full set of spectra from 3.5 to 10GHz software and hardware by Pei, together with Bastian Pei’s talk in the international meeting today Data analysis analysis of single cavity data (measurements at FNAL) analysis of FLASH data on-going Electronics contact to FNAL, interested to built the electronics
3
N. Baboi, DESY EuCARD SRF, HOM-Meeting, 4 th Quarter, Aug. 25, 2010 Conferences/Schools Conferences IPAC, Japan LINAC 2010, Sep., Japan participation of Pei paper with first beam measurements Schools for Pei RF for Accelerators, Denmark CAS, Introductory level, Sep., Bulgaria Courses at Manchester University / Cockcroft Institute various subjects on-line participation
4
N. Baboi, DESY EuCARD SRF, HOM-Meeting, 4 th Quarter, Aug. 25, 2010 Meetings this Semester EuCARD Task 5 meetings: April 7-9: with the occasion of the EuCARD SRF meeting at Cockcroft Institute today (on-line) International meetings July 5: meeting on data analysis –new participation of RHUL in the project July 13: meeting on HOM electronics –collaboration with FNAL today: meeting on data analysis, beam measurements and electronics design –participation of all involved in project
5
N. Baboi, DESY EuCARD SRF, HOM-Meeting, 4 th Quarter, Aug. 25, 2010 Status of the Electronics Design Interest to built electronics by FNAL based on experience with electronics for cavity BPMs at KEK XFEL would need uTCA based design due to time and resources constraint, design for FLASH will be (most likely) VME based further discussion in international meeting today
6
N. Baboi, DESY EuCARD SRF, HOM-Meeting, 4 th Quarter, Aug. 25, 2010 Outlook Electronics design based on measurements with beam need some more discussions Possibility to ask for beam time for Sep. limited total time (2 weeks for all FLASH studies) Pei is not here Beam time in Jan extensive studies
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.