Presentation is loading. Please wait.

Presentation is loading. Please wait.

2015: 5 Months2016: 5 Months Sarpi 466,731501,3217.4% Tsiteli Khidi 360,839460,37327.6% Sadakhlo 334,483356,5146.6% Kazbegi.

Similar presentations


Presentation on theme: "2015: 5 Months2016: 5 Months Sarpi 466,731501,3217.4% Tsiteli Khidi 360,839460,37327.6% Sadakhlo 334,483356,5146.6% Kazbegi."— Presentation transcript:

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15 2015: 5 Months2016: 5 Months Sarpi 466,731501,3217.4% Tsiteli Khidi 360,839460,37327.6% Sadakhlo 334,483356,5146.6% Kazbegi 234,804271,59915.7% Airport Tbilisi 186,456252,92735.6% Tsodna 75,08367,767-9.7% Ninotsminda 58,77758,620-0.3% Vale 27,79235,52627.8% Airport Kutaisi 20,42224,33219.1% Vakhtangisi 21,78221,340-2.0% Airport Batumi 10,39419,30385.7% Kartsakhi 010,552 Railway Gardabani 11,4329,784-14.4% Guguti 9,8039,498-3.1% Port Batumi 6,2937,40217.6% Port Poti 7,1776,591-8.2% Railway Sadakhlo 4,7794,453-6.8% Port Kulevi 1,2121,114-8.1% Samtatskaro 143 0.0% Akhkerpi 1141161.8%

16

17

18

19

20

21

22

23

24


Download ppt "2015: 5 Months2016: 5 Months Sarpi 466,731501,3217.4% Tsiteli Khidi 360,839460,37327.6% Sadakhlo 334,483356,5146.6% Kazbegi."

Similar presentations


Ads by Google