Presentation is loading. Please wait.

Presentation is loading. Please wait.

Intermountain Construction Right Of Way Maintenance Company.

Similar presentations


Presentation on theme: "Intermountain Construction Right Of Way Maintenance Company."— Presentation transcript:

1

2 Intermountain Construction Right Of Way Maintenance Company

3 1997 Intermountain Construction began leak surveying for Williams Field Service. During this first year we became familiar with Williams’ policies, pipelines, locations,and personnel. Also during this time we found a significant amount of Natural Gas leaks.

4 1997 In addition to leak surveying we began a system of notifying property owners in the jurisdictional areas when we would be leak surveying on their property. We also took on the task of compiling and monitoring of the Gathering System location books. Every year we update our Customers location books as well as keeping a complete record of our own. We became in compliance with the DOT Regulation 49 CFR 40 By implementing a drug and alcohol plan. Our drug and alcohol plan mandates pre-employment as well as random screenings.

5 October 1998 Intermountain began taking care of onecalls for the Tres Rios gathering district of Williams field Service. Intermountain takes a serious and fastidious approach to one calls. Our goal is 100% accuracy and safety.

6 May 2000 Williams Field Service restructured and Intermountain became responsible for a larger area of Williams Field Service. We became responsible for one calls and leak survey in all Four Corners Area districts of Williams Field Service.

7 August 2000 Intermountain began installing carsonite signs on the right of way rehab project from AM 149 to Kutz station.

8 OCTOBER 2000 Intermountain Construction began a safety program. We developed a safety manual and implemented monthly safety meetings as well as weekly tailgate meetings.

9 February 2001 In February 2001 all of Intermountain Construction personnel became certified with a Basic Safety Certificate that includes: – 1910.146 Confined Space Awareness – 1910.157 Fire Fighting, Incipient Stages – 1910.1200 Hazard Communication (HazCom) – 1910.120 HAZWOPPER Awareness – 1910.147 Lockout/Tagout – 1910.132 Personal Protective Equipment – 1910.34 Respiratory Protection

10 2005 Intermountain Construction now offers & will continue to offer  Line locating or One Calls  Jurisdictional & Non-Jurisdictional Leak Surveys with reports  Carsonite or Post installation  Valve Greasing  GPS Mapping and Plotting  AS Builts  Emergency shut down procedure manuals with photos and driving instructions  Road Excavation and Maintenance  Brush cutting on Pipeline ROW and Seeding  DOT Reports  CDP Environmental Clean Up  Hydro Excavation ( Vac truck/ Pot Holeing)

11 Qualifications We are in DOT compliance with our drug and alcohol program We carry five million dollars in liability insurance We are also Operator Qualified through NCCER ISNetworld Driver Licenses for all employees verified through SAMBA “Status, Driving records, Etc…”

12 2006 Intermountain Construction becomes Integrity Pipeline Service, Inc. Full Service Right of Way Maintenance Company

13 Divisions Intermountain Construction, Inc. Integrity Pipeline Service, Inc. Operator Qualifications Testing Center

14 Scott Robinson General Manager Scott Robinson General Manager Earl Bell & Barbara Bell Board of Directors Earl Bell & Barbara Bell Board of Directors Barbara Bell Finance Director Barbara Bell Finance Director Lupe Samora Office Manager Jason Nigel Field Supervisor Billing Clerk One Call Administrator Human Resource Coordinator Pipeline Service Technician III Pipeline Service Technician II Pipeline Service Technician I Pipeline Service Technician III Pipeline Service Technician II Pipeline Service Technician I Robert Wilson Field Supervisor Organizational Chart

15 Integrity Pipeline Services  Earl Bell & Barbara Bell - Board of Directors  Barbara Bell - Financial Manager  Scott Robinson - General Manager

16 Original Customer Base Williams Field Serive Teppco GP, Affilates Enterprise Mid America ChevTexaco ConocoPhillips XTO Energy Burlington Resources Peoples Energy Pogo Production

17 New Services Coming Soon COMPLETE RIGHT OF WAY MAINTENANCE Depth Surveys and Line Profiling Increased Mapping Services

18 QUESTIONS 505-334-8035 QUESTIONS 505-334-8035 THANK YOU! Go to the Contact us link on our Website


Download ppt "Intermountain Construction Right Of Way Maintenance Company."

Similar presentations


Ads by Google