Presentation is loading. Please wait.

Presentation is loading. Please wait.

Monitor Define Deliver Operate Sprint Define Deliver Complex Error-prone Chaotic.

Similar presentations


Presentation on theme: "Monitor Define Deliver Operate Sprint Define Deliver Complex Error-prone Chaotic."— Presentation transcript:

1

2

3

4

5

6

7

8

9 Monitor Define Deliver Operate Sprint Define Deliver Complex Error-prone Chaotic

10 DEV QA INT PROD TFS

11 DEV QA INT PROD TFS

12 DEV QA INT PROD TFS

13 DEV QA INT PROD TFS Full Traceability

14 Manage the full stack

15 TFS Drop Location RM DesktopRM Web QADEV RM Server

16 Assumed State Start with an Assumption of target Environment Run a series of actions Desired State End with desired state (hopefully) Send a description of the desired state DSC capability reaches the desired state Get.Test.Set “Make it so” DSC Resources TFS Config as Code Shared Gallery

17

18

19

20

21

22

23

24 www.microsoft.com/learning http://developer.microsoft.com http://microsoft.com/technet http://channel9.msdn.com/Events/TechEd

25

26

27


Download ppt "Monitor Define Deliver Operate Sprint Define Deliver Complex Error-prone Chaotic."

Similar presentations


Ads by Google