Download presentation
Presentation is loading. Please wait.
Published byRoy Price Modified over 8 years ago
1
doc.: IEEE 802.15-16-0190-01 Submission March 2016 Robert F. Heile, Wi-SUN AllianceSlide 1 101st Session of meetings of the IEEE 802.15 Working Group for Wireless Personal Area Networks March 13-18, 2016 The Ventitian Hotel Macau Macau, China
2
doc.: IEEE 802.15-16-0190-01 Submission March 2016 Robert F. Heile, Wi-SUN AllianceSlide 2 802.15 Organization Chart 802.15WG Chair Bob Heile, Wi-SUN Alliance 802.15 Vice Chairs Rick Alfvin, VeriLAN Pat Kinney, Kinney Consulting Task Groups Secretary Pat Kinney, Kinney Consulting Assistant Secretary Mike McInnis, Boeing Working Group Technical Editor James Gilb SCs for New Projects (WNG), Maintenance, Rules Chair: Pat Kinney, Kinney Consulting TG9 Key Management Protocol Chair: Robert Moskowitz, self TG3e High Rate Close Proximty Chair: Andrew Estrada, Sony TG4t High(er) Rate PHY (HRP) Chair, Clint Powell, Powell Consulting TG4u India 865-867 Band PHY (ISB) Chair, Phil Beecher, Wi- SUN STUDY GROUPS: SG12 Consolidated LLC (CLLC) Chair: Pat Kinney, Kinney Consulting SG4v Regional Sub Gig Bands (RSB) Chair, Kunal Shah, Silver Spring Nets INTEREST GROUPS IG TeraHertz (THZ) Chair: Thomas Kürner, Technische Universität Braunschweig IG Dependability (of Radio Links) Chair: Ryuji Kohno, IG High Rate Rail Communications Chair: Junhyeong Kim, ETRI IG 6Tisch Chair: Pat Kinney, Kinney Consulting IG 15.4 Guide Chair: TBD Hibernating: TG4r 15.4 ranging To add your name to the WG/TG/SG/IG reflectors please go to www.ieee802.org/15www.ieee802.org/15 open TG10 Layer 2 Routing Chair: Clint Powell, Self TG3d 100Gbps PHY Thomas Kürner, Chair Technische Universität Braunschweig TG4s Spectrum Resource Use (SRU) Chair: Shoichi Kitazawa, ATR Wave Eng TG8 Peer Aware Communications Chair: Myung Lee, CUNY TG7R Optical Wireless Communications Yeong Min Jang, Kookmin University Chair TG3m 15.3 Revison 1 Chair: James Gilb, Gilb Consulting
3
doc.: IEEE 802.15-16-0190-01 Submission March 2016 Robert F. Heile, Wi-SUN AllianceSlide 3 Macau Session Objectives March 13-18, 2016 TASK GROUP 3d –100Gbps THz PHY 1.Review and Discuss Contributions from CFP 2.Update Project Plan/Timeline TASK GROUP 3e –High Rate Close Proximity (HRCP) 1.Letter Ballot Comment Resolution 2.Update Project Plan/Timeline TASK GROUP 3m –15.3 REVISIONa 1.Secure EC approval to forward to RevCom
4
doc.: IEEE 802.15-16-0190-01 Submission March 2016 Robert F. Heile, Wi-SUN AllianceSlide 4 Macau Session Objectives March 13-18, 2016 TASK GROUP 4s Spectrum Resource Utilization(SRU) 1.Work on Technical Guidance Doc (TGD) 2.Work on parts of draft 3.Update Project Timeline Task Group 4t 15.4 High(er) Rate PHY (HRP) 1.Review contributions from CFP 2.Update Project timeline Task Group 4u PHY for 865-867 band in India 1.Secure WG approval to start letter ballot 2.Update project timeline as needed
5
doc.: IEEE 802.15-16-0190-01 Submission March 2016 Robert F. Heile, Wi-SUN AllianceSlide 5 Macau Session Objectives March 13-18, 2016 Task Group 7m Optical Wireless Communications (OWC) 1.Review and discuss contributions 2.Continue developing TGD 3.Generate/Update Project Timeline TASK GROUP-8 Peer Aware Communications 1.Continue work on draft 2.Update Project Plan/Timeline TASK GROUP 9 –Key Management Protocol: 1.Approved by RevCom March 4- project complete
6
doc.: IEEE 802.15-16-0190-01 Submission March 2016 Robert F. Heile, Wi-SUN AllianceSlide 6 Macau Session Objectives March 13-18, 2016 TASK GROUP 10--Layer 2 Routing (L2R): 1.Letter Ballot comment resolution 2.Update Project Plan/Timeline STUDY GROUP 12 -15.4 Upper Layer Interface (ULI) 1.Secure EC approval to forward PAR to NesCom 2.Joint Meeting with 802.1 STUDY GROUP 4v –Add/Update Regional Sub Gig Bands 1.Secure EC approval to forward PAR to NesCom THz Interest Group: 1.Hear contributions relating to THz comms. 2.Review ongoing mission/goals/new project potential
7
doc.: IEEE 802.15-16-0190-01 Submission March 2016 Robert F. Heile, Wi-SUN AllianceSlide 7 Dependability Interest Group: 1.Discuss Contributions 2.Evaluate if Study Group is warranted High Rate Railroad Communications IG 1.Discuss opportunities for standards work 2.Review ongoing mission of the group 6 TiSCH Interest Group 1.Hear contributions 2.Plan for IETF95 NEW PROJECTS SUBCOMMITTEE (WNG) 1.Review/discuss contributions Macau Session Objectives March 13-18, 2016
8
doc.: IEEE 802.15-16-0190-01 Submission March 2016 Robert F. Heile, Wi-SUN AllianceSlide 8
9
doc.: IEEE 802.15-16-0190-01 Submission March 2016 Robert F. Heile, Wi-SUN AllianceSlide 9 Upcoming Sessions May 15-20, 2016, Hilton Waikoloa Village, Kona, HI, USA, 802 Wireless Interim Session.* July 24-29, 2016, Manchester Grand Hyatt, San Diego, CA, USA, 802 Plenary Session. September 11-16, 2016, Marriott Warsaw, Warsaw, Poland, 802 Wireless Interim Session.* November 6-11, 2016, Grand Hyatt San Antonio, San Antonio, TX, USA, 802 Plenary Session. January 15-20, 2017, Hyatt Regency Atlanta, Atlanta, GA, USA, 802 Wireless Interim Session.* March 12-17, 2017, Hyatt Regency Vancouver, 802 Plenary Session. May 7-12, 2017, Daejeon Convention Center, Daejeon Korea (TBC), 802 Wireless Interim Session.* July 9-14, 2017, Estrel Hotel and Convention Center, Berlin, Germany, 802 Plenary Session.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.