ONLINE PROJECT MONITORING SYSTEM RECLAMATION OF KAPULUPPADA & AJITHSINGH NAGAR MSW DEMPSITES THROUGH BIO – MINING PROCESS AT GVMC & VMC SWACHHA ANDHRA.

Similar presentations


Presentation on theme: "ONLINE PROJECT MONITORING SYSTEM RECLAMATION OF KAPULUPPADA & AJITHSINGH NAGAR MSW DEMPSITES THROUGH BIO – MINING PROCESS AT GVMC & VMC SWACHHA ANDHRA."— Presentation transcript:

1 ONLINE PROJECT MONITORING SYSTEM RECLAMATION OF KAPULUPPADA & AJITHSINGH NAGAR MSW DEMPSITES THROUGH BIO – MINING PROCESS AT GVMC & VMC SWACHHA ANDHRA CORPORATION DEPARTMENT OF MUNICIPAL ADMINISTRATION & URBAN DEVELOPMENT

2 The bio-mining/bio-remediation process involves collecting and/or digging up the existing waste, stabilizing the waste, spreading and sun drying/mechanical drying of waste followed by screening & segregating the waste through mechanical process. The combustibles (such as plastic, cloth, woody matter) will be separated to use as RDF. Project : Reclamation of Dumpsites through Bio-mining S.NoITEMGVMCVMC 1Population (in lakhs)18.8310.48 2Area in Sq.km53361.88 3No of Wards7259 4MSW Dumpsite locationKapulupadaAjitsinghnagar 5Existing Quantity of waste dump (Tonnes)18,21,0901,70,000 6Area of Location, in Acres12010.00

3 KAPULUPPADA DUMP SITE AJITHSINGH NAGAR DUMP SITE

4 Operating Model of the WtE Project in Andhra Pradesh The Operating Model of Bio-mining Projects Monitoring Agency: Urban Local Body NFCL/MARKFED/ DIRECT MARKETING MSW dump site Recycle Vendors Bio mining process by the developer As per MSW Guidelines using for road works Compost Recyclables Rejects/ Inerts RDF Revenue to the Developer Revenue line RDF Vendors ULB Scientific Landfilling/ Capping maximum 10% Reclamation of 90% land Royalty to ULB Process line

5 The reclamation of dump sites through Bio-mining process at Visakhapatnam and Vijayawada are under PPP model. 90% of dump site will be reclaimed for developmental activities and 10% of dump site would be converted in to bio-capping. EoI floated on 6 th February 2016 and Request for Proposal floated on ----------2016. The Project/RFP Timelines S.NoITEMDATE 1 RFP downloadable from website www.sac.ap.gov.inwww.sac.ap.gov.in 29.06.2016 2Last date for submission of queries 3Pre-bid conference 4Last date for submission of proposals 5 Opening of “other submissions and bid security and technical proposals” 6Presentation by technically qualified bidders 7Opening of financial proposals 8Issue of “Letter of Intent” (LoI) 9Last date for acceptance by shortlisted bidder 10Issue of “Letter of Award” LoA 11Last date for signing Concession Agreement

6 Project Timelines & Obligations Stake holderDesign Build Operate Model : OBLIGATIONS NFCL / Agl. Dept.-Markets the produced City Compost in Bio-mining process, as per GoI guidelines. ULB-ULB will handover the dumpsite for concession period. Developer- Clears the dump waste by processing the waste in bio-mining method and disposes as per MSW Rules and reclaims the 90% dumpsite and 10% bio-capped land to ULB. Issue of RFP Signing of CA Commissioning of project End of Concession Period 77 days Construction period: 6 months Operation Period: 5 Yr. for GVMC, 2 yrs. For VMC Development Period 6 months Land Handover 30 days

7 Project : Schedule vs Progress ACTIVITYSTART DATE END DATE Q2-16Q3-16Q4-16Q1-17 June 2016 July 2016 August 2016 September 2016 October 2016 November 2016 December 2016 January 2017 February 2017 March 2017 GVMC June-16March-17 June-16 CRDA /VMC June-16March-17 June-16 Handover of Land Commissioning of Project Planned as per Bid documents Actual progress Floating of RFP Letter of Award Concessionaire agreement

8 8 This Biomining Process will helps in minimizing environmental impact by reducing the existing air pollution, ground water contamination, etc. GVMC & VMC can mitigate uncontrolled methane (CH4) emissions into atmosphere. The reclaimed land cam be used for other developmental activities. They have the advantage of producing less odor, covering a larger area in less time and can be located closer to buildings without end angering the integrity of the buildings. Avoided or reduced costs of landfill closure and post closure care and monitoring Revenues from recyclable and reusable materials, e.g., ferrous metals, aluminum, plastics, and glasses. Combustible waste and reclaimed soil are sold as fuel and construction fill, or for other uses. The plastics and the inert depending upon the quality can be extruded at high temperature to make value added products such as pavements, railway sleepers, lamp posts, fencing posts, bricks, etc.- providing value added products as well as successful recycling of waste. The City Compost generated from bio-mining process will enrich the agriculture fields by additional carbon for more yield, apart from earning subsidy of Rs.1500/- per ton from central Govt. Benefits of the project