Download presentation
Presentation is loading. Please wait.
Published byJocelin Harrington Modified over 8 years ago
1
Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2016
3
Today’s Topics
4
Increasing Emissions NSR Authorization Types De Minimis Permit By Rule Standard Permit State Permits, NNSR, PSD
5
NSR and Title V Increasing Emissions De Minimis MINOR Standard Permit By Rule General Operating Permit State Permits, NNSR, PSD Site Operating Permit
6
De Minimis Authorizations
7
De Minimis Examples
8
§116.119 De Minimis Facilities or SourcesLimits Cleaning and stripping solvents50 gal/yr Coatings (excluding plating materials)100 gal/yr Dyes1,000 lb/yr Bleaches1,000 gal/yr Fragrances (excluding odorants)250 gal/yr Cleaning and stripping solvents, 50 gallons/year; Coatings (excluding plating materials), 100 gallons/year Dyes, 1,000 pounds/year Bleaches, 1,000 gallons/year Fragrances (excluding odorants), 250 gallons/year
9
NSR Authorizations Increasing Emissions De Minimis Permit By Rule Standard Permit
10
Permits By Rule
11
PBR Rules Texas Administrative Code Title 30Chapter 106
12
PBR Subchapters Chapter 106 Subchapter E: Aggregate and Pavement Subchapter K: General Subchapter O: Oil and Gas Subchapter S: Surface Coating Subchapter U: Tanks, Storage, and Loading
13
Subchapter E
14
Subchapter K
15
Subchapter O
16
Subchapters S & T
17
Subchapter U
18
NSR Authorizations Increasing Emissions Permit By Rule Standard Permit
19
Standard Permits
20
RR Standard Permits 30 TAC §116.620 Old Standard Permit Non-Rule Oil & Gas Standard Permit Oil & Gas 30 TAC §116.621 Old MSW Standard Permit 30 TAC §330 – Subchapter U Municipal Solid Waste
21
Standard Permits Sections Mechanical/Agricultural/ Construction/Coatings Energy/Combustion Chemical
22
NSR Authorizations Increasing Emissions Standard Permit
23
Today’s Topics
24
Using a PBR Emissions limits Claim or register? Why would I certify? How can I submit my application? Fees Guide to PBRs
25
Emissions Limits §106.4 – General Limits §106.261 - PBR Specific Limits 250 tpy CO & NO x 25 tpy VOC, SO 2, & PM 15 tpy PM 10 10 tpy PM 2.5 6 lb/hr NO x 10 tpy
26
Claim Register
28
Why Certify?
29
How to Apply All PBRs Oil & gas standard permits APD-CERTs General permits PST self-certification Permits Or traditional mail
30
ePermits Login
31
Fees Small Business - $100 All others - $450 Permit by Rule $900 Standard Permit
32
Today’s Topics
33
The Application
37
Blank oil and gas spreadsheet
38
Blank Surface Coating Compliance Worksheet
40
Today’s Topics
41
Coatings by Joe If you can dream it, we can paint it
42
The Application
47
2.00 ; :
48
;
51
532 ft. = building site 532 ft. to nearest receptor
53
Submitting the Application Permits
54
Then What?
55
Deficiency?
56
Today’s Topics
57
Questions? airog@tceq.texas.gov Air Permits Main line: (512) 239-1250
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.