STRATEGY FOR IMPLEMENTATION OF INGA HYDROELELECTRIC POWER
WEST AFRICA POWER POOL COTONOU, BENIN /
2
Status of Power Supply in ECOWAS: Supply Sources
2 2
3
Status of Power Supply in ECOWAS: Demand-Supply Balance
3 3
4
West Africa Gas Pipeline (WAGP) 330KV COSTAL TRANSMISSION BACKBONE
400 MW Maria Gleta 1,000 MW Lagos Environ West Africa Gas Pipeline (WAGP) 400 MW Aboadze 330KV COSTAL TRANSMISSION BACKBONE 330 kV Volta (GHANA)– Lome “C” (TOGO) – Sakété (BENIN) – Ikeja West (NIGERIA)
5
WAPP Implementation Strategy
Based on realizing six Priority Projects : Coastal Transmission Backbone Subprogram (Côte d’Ivoire, Ghana, Benin/Togo, Nigeria). Inter-zonal Transmission Hub Sub-program (Burkina Faso, OMVS via Mali, Mali via Côte d’Ivoire, LSG via Côte d’Ivoire). North-core Transmission Sub-program (Nigeria, Niger, Burkina Faso, Benin). OMVG/OMVS Power System Development Subprogram (The Gambia, Guinea, Guinea Bissau, Mali, Senegal) Côte d’Ivoire-Liberia-Sierra Leone-Guinea Power System Re-development Subprogram (Côte d’Ivoire, Liberia, Sierra Leone, Guinea). WAPP Strategic Generation Subprogram (Emergency Power Supply Security Plan).
6
Implementation Road Map
Coastal Trans Backbone Sub-program Inter-Zonal Trans Hub Sub-program North-core Trans Sub-program OMVG/OMVS Development Sub-program CLSG System Redevelopment Sub-program Inter Zonal Northcore NIGERIA NIGER MALI SENEGAL GAMBIA TOGO GHANA CÔTE D’IVOIRE BURKINA FASO BENIN GUINEA BISSAU GUINEA OMVG-OMVS SIERRA LEONE LIBERIA CLSG Coastal Backbone Implementation Road Map 6 6
7
Summary – Implementation Schedule
NIGERIA BENIN TOGO GHANA SENEGAL THE GAMBIA GUINEA BISSAU GUINEA NIGER MALI CÔTE D’IVOIRE BURKINA FASO LIBERIA SIERRA LEONE Interconnection in service WAPP Projects by 2011 COMMITTED: Ikeja West (Nigeria) – Sakété (Benin) (330 kV) Aboadze – Volta, in Ghana (330 kV) Bobo Dioulasso – Ouagadougou, in Burkina-Faso (225 kV) RECOMMENDED: Volta (Ghana) – Momé Hagou (Togo) – Sakété (Benin) – (330 kV) Ferkéssédougou (Côte d’Ivoire) – Sikasso (Mali) (225 kV), plus Sikasso – Ségou, in Mali – 150 kV Félou hydro project OMVG: Linsan (Guinea) – Kaolack (Senegal), via Guinea-Bissau, Gambia (225 kV), plus Kaléta hydro project National Control Centres – Burkina Faso, Guinea, Mali, Senegal 225 kV Bobo Dioulasso – Ouagadougou : OPERATIONAL SINCE DECEMBER 2009 330 kV Aboadze (Ghana) – Volta (Ghana); IMPLEMENTATION : 2010 330 kV Volta (Ghana) – Lome “C” (Togo) – Sakete (Benin); IMPLEMENTATION : 2013 60 MW WAPP Felou Hydropower; IMPLEMENTATION : 2013 225 kV Bolgatanga (Ghana) – Ouagadougou (Burkina Faso); PRE-INVESTMENT : 2013 147 MW WAPP Adjarala Hydropower – FINANCING REQUIRED : 2014 330 kV Birnin Kebbi (Nigeria) - Bembereke (Benin) – Niamey (Niger) – Ouagadougou (Burkina Faso); PRE-INVESTMENT :