Download presentation
Presentation is loading. Please wait.
Published byMarion Craig Modified over 8 years ago
1
Irradiation of ATLAS12A and 07 pairs at CYRIC Nobu U., Tony A.,... 2014/8/22 ITk strip sensors meeting, Y. Unno1
2
CYRIC irradiation, Sep. 2014 Beam etc. – 70 MeV protons – Current: ≤ 1 µA – Scanning stage: approximately 11 x 11 cm 2 max. – Cooling: ≤ 0 deg.C in dry N 2 environment We may reach to -10 deg.C this time with a new cold dry N 2 supply... Irradiation dates – Irradiation:16-17 Sep. 2014 (1.5 days effectively) – Travel:15 Sep. – Preparation:1-12 Sep. Samples should be received at KEK by the end of Aug. or so. Need one week of transportation, thus NOW is the time to ship the samples 2014/8/22 ITk strip sensors meeting, Y. Unno2
3
ATLAS12A, 07 Samples Liverpool has a stock of ATLAS12A and ATLAS07 miniature sensors Irradiation plan – Fluence (5 points): 1x10 14, 5x10 14, 1x10 15, 2x10 15, 5x10 15 neq/cm 2 – # of Samples:2 each ATLAS12A 10 pcs, ATLAS07 10 pcs 1 set (5 12A and 5 07A) each for: – KEK, Liverpool/Ljubljana, and... Questions to community Any request for 3 rd set? A reference (non-irrad): what and how many? – if all sites has a reference already, no need to add a reference. 2014/8/22 ITk strip sensors meeting, Y. Unno3
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.