D. Piccolomeeting RPC Italia - Ischia september 20-22 2009 1 CRAFT08 paper status D. Piccolo Laboratori Nazionali di Frascati INFN.

Similar presentations


Presentation on theme: "D. Piccolomeeting RPC Italia - Ischia september 20-22 2009 1 CRAFT08 paper status D. Piccolo Laboratori Nazionali di Frascati INFN."— Presentation transcript:

1 D. Piccolomeeting RPC Italia - Ischia september 20-22 2009 1 CRAFT08 paper status D. Piccolo Laboratori Nazionali di Frascati INFN

2 D. Piccolomeeting RPC Italia - Ischia september 20-22 2009 2 status The final version of the paper can be find on CADI: http://cms.cern.ch/iCMS/analysisadmin/analysismanagement?awg= CFT First revision from RPC internal referees –M. Abbrescia and Sijin The paper is under review of the ARC: M. Dalla Valle, D. Giordano, L. Litov, P. Marage –Several comments received both of technical nature and regarding style. Style modifications done Technical comments have required more work: almost all the requests have been fulfilled We are waiting for the final approval of the ARC referees (should arrive in few days) As soon as the ARC referees approve the paper, the CMS Collaboration Wide Review will start Main news respect to previews version: –Operation section inserted –Cluster size and residual analysis repeated with a cut on ±20 degrees in angle respect to perpendicular to RPC plane –Dropped section on HV scan

3 D. Piccolomeeting RPC Italia - Ischia september 20-22 2009 3 17 pages 16 figures paper layout 1.Introduction 2.System layout 3.Detector operation and monitor 4.Synchronization of RPC data 5.Detector performance 6.Conclusions

4 D. Piccolomeeting RPC Italia - Ischia september 20-22 2009 4 Detector monitoring C. Viviani

5 D. Piccolomeeting RPC Italia - Ischia september 20-22 2009 5 Noise and data synchronization A. Ocampo M. Konecki

6 D. Piccolomeeting RPC Italia - Ischia september 20-22 2009 6 Cluster size - 1 C. Carillo

7 D. Piccolomeeting RPC Italia - Ischia september 20-22 2009 7 Cluster size - 2 Open issues to be better understood: 1 – tails of distributions 2 – asymmetry in cls vs angle: C. Carillo NOT in the paper Minimum not at 0

8 D. Piccolomeeting RPC Italia - Ischia september 20-22 2009 8 residuals Open issue: RB2in residuals C. Carillo

9 D. Piccolomeeting RPC Italia - Ischia september 20-22 2009 9 efficiency C. Carillo, R. Trentadue

10 D. Piccolomeeting RPC Italia - Ischia september 20-22 2009 10 Conclusions The paper is in the last stage of approval from ARC referees CMS Collaboration Wide review should start in the coming days Thanks to –RPC internal referees (M. Abbrescia, Sijin) –All people contributing with plots, infos C. Viviani, A. Ocampo, C. Carrillo, R. Trentadue, S Tupputi, Sungeen