Annual Performance Report – 2011/12
Portfolio Committee For Human Settlements Mr. T. Zulu Director-General
2
Vision “A Nation Housed In Sustainable Human Settlements With Access To Socio – Economic Infrastructure” Mission “ To Establish & Facilitate A Sustainable Process That Provides Equitable Access To Adequate Housing For All Within The Context Of Affordability Of Housing, Services, Access To Social Amenities & Economic Opportunities”
3
Contents Overview of Performance Departmental Programme Performance
Communication and Outreach key Delivery Agreement on Outcome 8 Job Creation Accreditation of Municipalities Turnaround Strategy Entities Report Financial Matters
4
Overview of Performance
1. The Department has achieved an unqualified audit report with emphasis of matters on: Restatement of corresponding figures and Material under spending on Rural Household and Infrastructure Grant. 2. There is agreement that the matters of emphasis are not systemic and there is commitment to address the issues including the 30 day payment rule and measurable performance indicators.
5
Overview of Performance
3. There is clearly a need to improve our procurement and asset management regimes and this includes: the establishment of a bid specification committee to vet requests for proposals and adverts. Further training for the staff members involved and establishing a distinct asset management unit.
6
Overview of Performance
4. The Departments improved monitoring and oversight is yielding results with better accountability of Provinces but this requires an holistic interspherical response – Legislature, Executive and Accounting Officers 5. This includes better business plan management and reporting.
7
Overview of Performance
6. A process to improve accountability and alignment of the entities is also yielding results with better strategic alignment of entities performance to the priorities of government. 7. We started a process to improve policy responses and this includes the review of FLiSP as well as review and evaluation of the Departmental Programmes. 8. It is expected that the implementation of the turnaround strategy will see the results of a better programme and administrative response to government developmental priorities.
8
Overview of Performance
9. Our intergovernmental processes have yielded good results including that with Parliament, Provinces and Municipalities . 10. Good progress has been made with the implementation of the USDG and aligning of Provincial and Municipal Human Settlements priorities with that of the National sphere. 11. A lot of work still has to be done in terms of improving Provincial and Municipal performances in respect of Outcome 8 and the Strategic Integrated Projects.
9
Departmental Programme Performance
Programme / Sub-Programme Approved Targets Achieved (%) Not Achieved Office of DG 8 4 (50) 4(50) Corporate Services (CS) 25 16(64) 9(36) Housing Policy, Research and Monitoring (HPRM) 16 10(63) 6(37) Housing Planning and Delivery Support (HPDS) 70 36(51) 34(49) Housing Development Finance (HDF) 13 11(85) 2(15) Strategic Relations and Governance (SRG) 39 35(90) 4(10) Departmental Total 171 112(65) 59(35)
11
Communication And Outreach
Campaigns Launched “Each One, Settle One” Campaign International Habitat Day Sixteen Days of No Violence Against Women and Children World Aids Day in Beaufort West
12
Communication And Outreach
Project Launches And House Handovers: Northam Affordable Housing Launch with Anglo Platinum Msukaligwa in Mpumalanga Southernwood Square Social Housing Project in Buffalo City The Jabulani Hostel Re-development in Soweto NHBRC International Housing and Home Warranty Conference Legacy Project Youth Build in Molemole, Limpopo Klarinet Integrated Housing Project in Mpumalanga China Square Project, Kimberley, Northern Cape National Women’s Build in Brandfort, Free State Province
13
Communication And Outreach
Stakeholder Events - Vision 2030 Summit, - Provincial Indaba’s and - Provincial Youth Summits - Alternative Technology in the Housing Programmes. - The Govan Mbeki Human Settlements Awards - A National Breakfast Session on Women’s Economic Empowerment with sector stakeholders - The National Youth in Human Settlements Summit
14
Progress Report on Outcome 8
Fifth Programme of Action Progress report for Outcome 8 - up to 30 September was submitted to the Technical Implementation Forum and the Implementation Forum and was approved for submission to relevant Cabinet Cluster. A detailed progress report for Outcome 8 was submitted to the Presidency for the Mid-Term Review. All relevant reports submitted to Cabinet for National Reporting on Outcome 8 and is included in the Presidency Web-Site.
15
Progress Report on Outcome 8
Progress on Outcome 8 Target Outputs Upgrading of Informal Settlements serviced sites 22,8% of total target of households Rental Accommodation units 14,2% of total of units
16
Progress Report on Outcome 8
National Upgrade Support Programme 46 (94%) out of 49 targeted Municipalities offered technical assistance; Six Provincial NUSP structures have been established (EC, KZN,LP, MP, NC and WC); Accreditation of Municipalities 17 municipalities assessed by Capacity and Compliance Assessment Panel and are awaiting MEC’s approval to be awarded with accreditation compliance certificates; First tranche payments of USDG made to relevant Metropolitan Municipalities
17
Progress Report on Outcome 8
Access to Basic Services Sanitation: 2011/12 up to 30 September 2011 provided households with access to sanitation facilities, bringing total since April 2010 to households; Based on Cabinet Lekgotla decision, operational plans are developed to target areas where backlogs are the highest. Release of Land for human settlement development The HDA has identified and assessed over ha of state land for suitability for release in 2011/12 up to 30 September 2011; Total of ha has been released to Municipalities while ha is in advance stages of release.
18
Progress Report on Outcome 8
Increased Urban Densities National Department developed policy document to address the dynamics of Built Environment, will assist provinces and municipalities with increased densities HDA identified 309 properties – 812,83 ha owned by Transnet for development of medium to high density Also developing mechanism to ensure that well located land released developed in accordance with higher density. Land-Use Management Framework Department of Rural Development and Land Reform released “Spatial Planning and land Use Management Bill for public consultation; Comments received analysed and Department of Rural Development and Land Reform will engage key stakeholders to revise the Bill.
19
Progress Report on Outcome 8
Mortgage Default Insurance Guarantee Concurrence from National Treasury is required to affirm the safety of the institutional arrangements to launch the MDI into the financial markets; All commercial banks have confirmed interest in supporting project implementation The consolidation of the Human Settlements Development Finance Institutions has been approved and relevant approvals being obtained including National Treasury and Cabinet.
20
Progress Report on Outcome 8
Sustainable Human Settlements and Basic Services Task Team Convened jointly by COGTA and NDHS and reports on: a) Rapidly Growing Towns and Cities; b) Informal Settlement Upgrade Programme in the 45 municipalities; c) Progress Report on the 23 Rural Municipalities identified by the Cabinet Lekgotla of June 2011; d) Report by the Presidential Infrastructure Commission on SIP 7
21
Job Creation The delivery of 116,056 completed houses and serviced cites from April 2011 to 31 March 2012 has created 81,868 employment opportunities. The information above is based on employment definition of one person employed for a period of one year. The employment opportunities created during the financial year 2011/12 is estimated to be direct jobs A further 27,838 indirect jobs created from the suppliers of building material as well as expenditure from income of employees.
22
Accreditation Of Municipalities
To date a total of twenty Municipalities within Mpumalanga, Limpopo, Northern Cape, Kwa-Zulu Natal and North West Provinces have been assessed. An overall framework aligning the process to government instruments has been produced A road map that outlines the key processes that has to be undertaken by the parties is in place and been implemented. A legislative review of powers, functions and delegations was initiated A monitoring and evaluation tool and toolkit was approved for production. The operation funding model for accredited municipalities was approved for investigation by MinMec Successfully achieved consensus with FFC on a financial framework plan.
23
Accreditation Of Municipalities
Challenges include: No Implementation Protocols signed by December deadline Funding framework remains major issue & query over role of Districts in accreditation based on powers & functions as contained in legislation. Provinces & Metropolitan Municipalities still to agree on capacity & support plans & leverage assistance e.g. COGTA, National Treasury, and Provincial Treasuries Provinces still to gazette municipal allocations
24
Turnaround Strategy The Turnaround Strategy prepared for the Department was approved by the Minister. An organizational structure underpinning the strategy was approved by the Minister of Human Settlements and Minister of Public Service and Administration. A process of filling vacancies was approved. A process of aligning the turnaround strategy with the strategic and annual performance plan as well as budget structure has commenced.
25
Rural Household Infrastructure Programme
PROGRESS PER PROVINCE – 2011/12 Province Allocation: 2011/12 (R’000) Number of Benefitting municipalities Estimated Target Number of Toilets Toilets completed at 31 March 2012 % Completion Eastern Cape R65,000 13 7 458 7 129 99.9% Free State R10,000 3 1 139 936 87.8% Limpopo R48,000 12 3 612 2 015 61.6% KwaZulu Natal R68,500 15 6 753 5 920 84.8% Mpumalanga R8,000 2 950 372 91.5% Northern Cape R4,000 1 374 320 73.8% North West R28,000 7 2 788 2 533 78.5% Grand Total R231,5 53 23 074 19 225 83.3%
26
RHIP Financial Performance 2011/12
Province 2011/12 Allocation & Rollovers R Expenditure at 31 March 2012 Balance KwaZulu - Natal Eastern Cape Limpopo North West Free State Mpumalanga Northern Cape Total
27
RHIP Outcomes and Achievements
Rural Household Infrastructure Programme intervention measures The Department conducted a quantity survey study to identify challenges and ways of resolving them in order to improve the performance of the RHIP programme Revision of the Sanitation Policy Versions 1.0; 2; 3 and 4.0 were developed Extensive consultation with stakeholders conducted Job creation A total number of jobs were created through RHIP Health and Hygiene Education households reached with Health and Hygiene education through RHIP
28
RHIP Outcome and Achievements
Free Basic Sanitation (FBS) Strategy Roll Out FBS rolled out to 16 Water Services Authorities FBS implementation guideline developed A draft FBS best practices and international benchmarking completed Post 94 Bucket Eradication Post 94 formal bucket backlog confirmed
29
Entities Performance
30
Social Housing Registration Authority
The Social Housing Regulatory Authority fully established and operational The appointment of the Council and the establishment of Council Committees were completed in the 2011/12 financial year. A total of rental units were approved for funding. The entity approved 4 and conditionally approved 14 applications for institutional accreditation. 18 Institutional grants were approved. Agreements were signed with NHFC, NURCHA, Kwa Zulu Natal, Eastern Cape and the North West Provincial Department of Human Settlements. 6 Project launches including two by the Minister of Human Settlements) The Regulations for the Social Housing as per the Social Housing Act were finalized.
31
Housing Development Agency
In the 2011/12 financial year the HDA identified 35, hectares of state and State Owned Enterprise (SOE) land for release for human settlements purposes. A total of 13,598 hectares have been formally submitted for release from custodian departments and the approval for release from the relevant departments is pending. The HDA provided project support services, PHDA framework development and capacity building support for 42 projects initiated by national departments, provincial departments and municipalities. 7 implementation protocols maintained and/or concluded; 5 signed agreements concluded and/or maintained; with 9 prepared and pending signature against an annual target of 15
32
National Urban Reconstruction Housing Agency
In 2011/2012 NURCHA reported an improvement from the previous year despite the subdued market conditions that existed in the residential market. The organizational focused to contribute effectively to the Outcome 8 targets and restoring sustainability to NURCHA business. This included growing the affordable housing programme to be a catalyst in the “Gap” housing market, establishing new financing partnerships and collaborating with Provincial Departments on fund and programme management services. The entity has also leveraged R292 million from new funding partners
33
The NURCHA has achieved growth in the gap funding
The NURCHA has achieved growth in the gap funding. 60% of NURCHA’s affordable housing portfolio is now in the affordable housing market (2 246 units) whilst 32% is affordable housing and sectional title units make up 8% of the loan book. The Entity intends to intensify its financing operations within the sectional title environment in the next financial year. With regards to outlining the organizational focus to contribute effectively to outcome 8 targets through affordable housing, the entity has signed loans amounting to R279 million in one year, achieving the R1 billion loan mark of loans issued since inception, which has resulted in the creation of affordable housing units.
34
Rural Housing Loan Fund
During the period under review, RHLF continued to perform within its mandate by concentrating its efforts in rural areas, with 82, 3% of its total loans being awarded in the rural areas, against a target of 80%. It is evident from the reported performance of RHLF that the lower end of the credit market continues to be significantly indebted. The entity has also managed to curb leakage, and ensured that 89, 6% of the total loans awarded are used for housing purposes, against a target of 80%. Out of the loans awarded, 4% was used for building of new houses, 12% was used for extensions, 71% was used for home improvements and 3% was used for services.
35
National Home Builders Registration Council
The NHBRC hosted an International Housing and Home Warranty Conference (IHHWC) from 25 September September 2011, which focused on international good practice and policy . The Council is currently reviewing the Housing Consumers Protection Measures Act (1998) to address any misalignment with other legislative prescripts, such as the Public Finance Management Act (1999) and the Consumer Protection Act (2008). The NHBRC has also embarked on a strategy that all units constructed in the Republic should be inspected and that all PHP projects and Rural projects should be inspected by the NHBRC whether enrolled or not. The registration of new home builders dropped down by 26 percent as compared to the previous financial year and this is due to home builders failing to meet the minimum technical and financial requirements, as well as the economic recession which has an impact in the construction industry. The Department commenced with the revision of the board and stabilization measures for better performance.
36
The NHBRC registered 2 686 new home builders during the 2011/12 financial year.
A total of homes were enrolled against , which is 14 percent above budget. However, NHBRC is still facing challenges with a number of provincial departments of Human Settlements in terms of ensuring that all projects are enrolled timeously. A total of 102,625 homes were inspected in the non-subsidised sector. A total of 86 projects were received for project enrolment of which a total of 49,070 units were approved for project enrolment. A total 583 projects for home enrolment of which a total of 161,411 units were approved for home enrolment. The entity conducted a total of 204,933 inspections and a total of 114,000 homes were inspected in the subsidy sector.
37
National Housing Finance Corporation
The 2011/12 year has been characterized by the success of the leveraging initiatives and partnerships with the private sector. The Corporation was able to leverage R2 billion which together with disbursements of R664 million contributed to the annual budget of the overall funding impact being exceeded by 32%. A total of 11 682 housing opportunities were created against a budget of The Corporation achieved 80% of the value of approvals budget of R1 billion. The pipeline continues to be robust and of note are the different structures such as applicants whose assets are mostly held in trusts.
38
National Housing Finance Corporation
The Corporate Plan for the Mortgage Default Insurance Company was approved by the Board. The key focus is now towards the completion of the application to the Financial Services Board for the insurance license Engagement with lenders individually as well as at industry level through the Banking Association of South Africa continues. Teams comprising of representatives of various lenders were established to consider product profiles, pricing and business processes. Discussions are also underway towards the planned pilot of the MDIC with one of the banks. The required consultation with National Treasury on the R1 Billion government guarantees, and the R150 million capitalization of the MDIC, has commenced.
39
Financial Report
40
2011/12 Final Adjusted Allocation
Programmes Original Allocation R’000 Roll-Overs Additional funds R’000 Virements Total Adjustments Final Allocation 1. Administration 232,435 676 -11,000 -10,324 222,111 2. Housing Policy, Research and Monitoring 39,215 227 39,442 3. Housing Planning and Delivery Support 156,163 31,135 713 12,000 43,848 200,011 4. Housing Development Finance 21,995,147 26,008 180,344 -4,000 202,352 22,197,499 5. Strategic Relations and Governance 155,535 7,496 447 3,000 10,943 166,478 Total 22,578,495 64,639 182,407 247,046 22,825,541
41
Adjustments Rollovers Approved from 2010/11 to 2011/12
R64,5 million approved R31,1 m (ACIP); R26 m (RHIP); R3,1 m for Turnaround Strategy Development; and R4,3 m for SITA Infrastructure Services. Additional funds R180 million for disaster relief; R2,4 million for higher salaries adjustments.
42
Programme Expenditure - 31 March 2012
Programmes Adjusted Allocation 1 R’000 Expenditure 2 Variance = 1- 2 % Spent 1. Administration 222,111 167,552 54,559 75% 2. Housing Policy, Research and Monitoring 39,442 32,954 6,488 83% 3. Housing Planning and Delivery Support 200,011 187,350 12,661 93% 4. Housing Development Finance 22,197,499 22,105,620 91,879 100% 5. Strategic Relations and Governance 166,478 105,444 61,034 63% Total 22,825,541 22,598,920 226,621 99%
43
Transfer Payments - 31 March 2012
Adjusted Allocation R000 Expenditure Variance % Spent Human Settlements Development Grant 14,941,516 100% Rural Households Infrastructure Development 257,508 172,874 84,634 67% Urban Settlements Development Grant 6,266,998 Housing Disaster Relief Grant 180,000 Social Housing Regulatory Authority: Operational 19,305 Rural Housing Loan Fund 49,500 Housing Development Agency 89,100 National Urban Reconstruction and Housing Agency 100,000 Social Housing Foundation 3,018 - 0% Social Housing Regulatory Authority: Capital Restructuring Grant 226,169 Total 22,133,114 22,045,462,242 87,652
44
Human Settlements Development Grant
Provinces Total Available 1 April March 2012 Transferred Funds Spent by Provinces Spent vs. Spent as % of Total Available Unspent as % of Total Available R'000 Eastern Cape 2,177,676 1,897,076 280,600 87% 13% Free State 913,907 903,431 10,476 99% 1% Gauteng 3,804,611 3,786,015 18,596 100% 0% KwaZulu-Natal 2,769,871 2,769,872 -1 Limpopo 1,398,914 1,259,394 139,520 90% 10% Mpumalanga 916,677 916,673 4 Northern Cape 322,639 322,617 22 North West 998,376 1,148,708 -150,332 115% -15% Western Cape 1,638,845 1,635,001 3,844 Total 14,941,516 14,638,787 302,729 98% 2%
45
Non-Financial Performance - HSDG
Province Annual Delivery Targets Delivery Performance as at 31 March 2012 Variance Delivery sites Variance Delivery Top Structure Total Variance Delivery Sites(units) Top Structure (units) Total Delivery Targets Sites Total Delivery Performance Eastern Cape 15,660 15,419 31,079 5,990 14,498 20,488 (9,670) (921) (10,591) Free State 7,680 7,526 15,206 7,400 9,070 16,470 (280) 1,544 1,264 Gauteng 15,606 34,294 49,900 15,803 22,521 38,324 197 (11,773) (11,576) KwaZulu-Natal 8,860 25,587 34,447 5,426 22,119 27,545 (3,434) (3,468) (6,902) Limpopo 3,000 13,410 16,410 1,752 13,619 15,371 (1,248) 209 (1,039) Mpumalanga 8,235 10,394 18,629 1,515 7,702 9,217 (6,720) (2,692) (9,412) Northern Cape 1,530 3,480 5,010 1,456 3,683 5,139 (74) 203 129 North West 8,688 17,883 26,571 10,559 16,333 26,892 1,871 (1,550) 321 Western Cape 13,085 12,640 25,725 8,686 11,065 19,751 (4,399) (1,575) (5,974) Total 82,344 140,633 222,977 58,587 120,610 179,197 (23,757) (20,023) (43,780)
46
Non-Financial Performance - HSDG
Delivery Variables/Milestones Amount (R) Emergency Housing 59,800,422 Rectification Programme 397,316,343 OpsCap 115,643,759 Feasibility Studies 29,950,917 Geo-tech Evaluation 1,092,024,404 Housing Planning 567,888 Land Purchases 524,145,896 Total 2,219,449,629
47
Urban Settlements Development Grant
48
Spent vs. Total Available Spent as % of Total Available
Municipalities Total Available 1 July March 2012 Transferred Funds Spent by Municipality Spent vs. Total Available Spent as % of Total Available Unspent as % of Total Available R'000 Buffalo City 423,446 79,699 343,747 19% 81% Nelson Mandela 502,626 262,195 240,431 52% 48% Mangaung 411,995 163,153 248,842 40% 60% Ekurhuleni 1,094,276 504,305 589,971 46% 54% City of JHB 1,027,970 470,176 557,794 City of Tshwane 891,081 349,874 541,207 39% 61% eThekwini 1,091,574 558,323 533,251 51% 49% City of Cape Town 824,030 287,972 536,058 35% 65% Total 6,266,998 2,675,697 3,591,301 43% 57%
49
Comment on Matters of Emphasis
Creation of commitments is now done differently as recommended by the audit team and contingent liabilities are now correctly disclosed The performance of the Rural Sanitation Programme is receiving attention and systems and measures are in place and it is expected the improved governance and programme performance will come through in the financial years to come.
50
Comment on Matters of Non-Compliance
Payments Made in respect of the 30 day prescripts A process has been put in place to address the issue and matters identified by the Auditor-General are receiving attention. Irregular Expenditure The procurement matters identified have been addressed and matters of interpretation corrected and aligned to Treasury Practice Notes.
51
Thank You