Download presentation
Presentation is loading. Please wait.
Published byTheodora Weaver Modified over 8 years ago
1
© 2005 Global Grid Forum The information contained herein is subject to change without notice Leading the pervasive adoption of grid computing for research and industry Welcome and Introduction OGSA-WG and fellow WGs F2F meetings in SF Bay Area January 16-20, 2006 Tom Maguire & Hiro Kishimoto, OGSA-WG co-chair
2
2 GGF Intellectual Property Policy All statements related to the activities of the GGF and addressed to the GGF are subject to all provisions of Appendix B of GFD-C.1, which grants to the GGF and its participants certain licenses and rights in such statements. Such statements include verbal statements in GGF meetings, as well as written and electronic communications made at any time or place, which are addressed to any GGF working group or portion thereof, Where the GFSG knows of rights, or claimed rights, the GGF secretariat shall attempt to obtain from the claimant of such rights, a written assurance that upon approval by the GFSG of the relevant GGF document(s), any party will be able to obtain the right to implement, use and distribute the technology or works when implementing, using or distributing technology based upon the specific specification(s) under openly specified, reasonable, non-discriminatory terms. The working group or research group proposing the use of the technology with respect to which the proprietary rights are claimed may assist the GGF secretariat in this effort. The results of this procedure shall not affect advancement of document, except that the GFSG may defer approval where a delay may facilitate the obtaining of such assurances. The results will, however, be recorded by the GGF Secretariat, and made available. The GFSG may also direct that a summary of the results be included in any GFD published containing the specification.
3
3 Meeting schedule Date/timeMain meeting (#334)Breakout (Room B) Jan. 16 Monday AM 9am-12:30pmOGSA-BESOGSA-data PM 1:30-5pmInfo modelOGSA-data Jan. 17 Tuesday AM 9am-12:30pmCDDLM/ACS joint PM 1:30-5:30pmWS-Management Profile Arch & Glossary 1.5 (1 hour) GRAAP joint Jan. 18 Wednesday AM 9am-12:30pmEMS composite roadmap PM 1:30-5pmOGSA naming RNS and WS-naming Jan. 19 Thursday AM 8am-12:30pmOGSA-ByteIO (1 hour) OGSA-Data PM 1:30-5pm OGSA-AuthZ (1~2 hour) OGSA security Jan. 20AM 9am-12:30pmSummary Next step
4
4 Jan. 18 (Wednesday) Morning 9am-12:30pm –EMS composite roadmap Lunch 12:30-2pm –Computer History Museum Visit Afternoon 2-5pm –OGSA-naming WG (WS-name and RNS-lite) If time permits –Future events schedule –OGSA WSRF Basic Profile Public Comment resolution –OGSA communication
5
5 Sequence diagram 3.3 An Application Using ACS Client JM EPS/CGS Submit() Eval() IS RS CDDLM Reserve() Deploy() Query() ACS JSDL Register() container Get() Deploy & configure () done Register() done CreateActivity WS-name
6
6 January 20 th Friday Early discussion (10 min) –Note taker –Role call and self introduction –Agenda bashing Improve communication (90 min) –GGF roadmap –EU data grid projects contribution to OGSA –OGSA communication Next step discussion (60 min) Summary and action items (30 min)
7
7 Document schedule (from charter) Document nameFirst draft available Ready for PCGFD publication OGSA Profile Definition 1.0Dec. 2004June 2005Dec. 2005 OGSA WSRF Basic Profile 1.0May 2005Sept. 2005Jan. 2006 OGSA Basic Security Profile 1.0 – Secure Channel Sept. 2005Nov. 2005Jan. 2006 OGSA Basic Security Profile 1.0 – Core Sept. 2005Nov. 2005Jan. 2006 OGSA Architecture & Glossary 1.5 Oct. 2005Nov. 2005Feb. 2006 OGSA EMS ArchitectureFeb. 2006July 2006Sept. 2006 OGSA Grid Information/Data Model Guidelines Jan. 2006March 2006May 2006
8
8 Current work OGSA WSRF Basic Profile 1.0 (Tom) –Send back to Editor by end of January OGSA Basic Security Profile 1.0 (Takuya) –Secure Channel and Core –Submit to Editor by 1 st week of February OGSA Architecture & Glossary 1.5 (Andreas & Jem) –Final call is around GGF16 and if possible submit to Editor at GGF16
9
9 Future work EMS –Composite roadmap (Andrew) Complete first draft by the end of February –OGSA EMS Architecture document (Andrew) Start architecture –Job Manager WG (Fred Brisard?) Ad hoc BoF at GGF16 OGSA Grid Information/Data Model Guidelines –BES container profile (Ellen) First draft by end of February –Guideline document (Fred Maciel) First draft by end of February Security (Takuya) –Architecture document and/or framework proposal by ??? Information Service (??) –Usecase and/or architecture document by ???
10
10 GGF16 and B2B F2F meeting Athens, Feb 13 (Mon) to 16 (Thu) –Round table: Feb. 13 (Mon) 1:30-3pm –Working session (info model): Feb. 14 (Tue) 10:30am- noon -> Wednesday –http://www.ggf.org/gf/event_schedule/http://www.ggf.org/gf/event_schedule/ F2F meeting Feb. 17 (Fri) –National Technical University of Athens –9am – 5pm –~ 25 people capacity, wifi network –Polycom –NO breakout room
11
11 GGF17 and B2B F2F meeting Tokyo, May 10 (Wed) to 12 (Fri) –One outreach and one working session –Tokyo International Forum –http://www.t-i-forum.co.jp/english/access.html F2F meeting –Venue NAREGI office or Fujitsu Headquarters –Date May 8 (Mon) May 9 (Tue), clashes GFSG meeting May 13 (Sat) <- first option
12
12 Interim F2F between GGF16 and GGF17? Topics Date –Late March or early April Location –??
13
13 Interim F2F between GGF16 and GGF17? Date –April 3-7 option #1 (8 yes) –April 10-14 option #2 (X Easter) (8) Location –London (Imperial College) (8) –Hayes (FLE) (8) –SF Bay Area (7) –Charlottesville (8) –New York (White Plains) (9)
14
14 Telecon Schedule (3 weeks to GGF16) Jan. 23 (Mon): No call Jan. 25 (Wed): –Basic security profile final text review –WSRF BP public comment discussion –EMS design team Jan. 30 (Mon): Review of F2F minutes and action items Feb. 1 (Wed): CDDLM joint call Feb. 6 (Mon): Info model & Arch 1.5 final text review Feb. 8 (Wed): –EMS design team –GGF16 prep
15
15 Summary and action items List up action items form draft minutes
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.