1 Up-lementation to v4.5 Sue Hughes Director, SCC Implementation/Upgrades

2 1.THINGS TO CONSIDER A. Planning B. Scope C. Benefits / Costs 2.PROCESS AND TIMELINE A. Conversion B. Validation C. Activation D. Post-Live Support AGENDA

3 A.PLANNING  Demos of Products – Know what you are getting  Timelines of other IT projects  Availability of resources THINGS TO CONSIDER

4 B.PROJECT SCOPE  Knowledge of features and functionalities of version 4.5 that you want to utilize – to include in implementation plan  Hardware assessment – do you need new servers to accommodate 4.5?  Change in Database? Oracle vs. dbVista  Change in Application Server Software? WebLogic vs. JBOSS vs. Glassfish  HL7 v. 2.5.1 interfaces required? MU2 tables? ELR?  A patch will be required for ALL OTHER SCC applications for compatibility with 4.5  Pathology  Billing THINGS TO CONSIDER

5 C.BENEFITS vs COSTS  BENEFITS: Establish a strategic architectural foundation for integration with both SCC and non-SCC applications. Tighter integration with many other SCC applications including Pathology and the Genetics Suite. Lots of new functionality in both Lab and Micro; lots of enhancements that solve some of the basic problems with our legacy applications  COSTS: Conversion Up-lementation Services Hardware? Training? Resources THINGS TO CONSIDER

6 TIMELINE and PROCESS LIVE New Servers Install SFW M12M11M10M9M8M7M6M5M4M3M2M1 SYSTEM PREP FOREIGN INTERFACES / ELR / REF LAB LAB / MIC ConversionValidationLivePostLive SU EU File Build Instrument Testing Set up Conversion Trn Validation SpecCoding / ConfigTesting / ValidationIntegrated Testing Timeline from signing to GO LIVE should be 9 months minimum to allow:  Set up changes  Interface delivery  Instrument testing  Adequate training

7 LIVE New Servers Install SFW M12M11M10M9M8M7M6M5M4M3M2M1 SYSTEM PREP Set up Conversion NOTES on Conversion Most existing setup files will be converted for Lab/Mic – but adjustments to all files will be needed TQC will be converted Patient Reports will be converted; standard SCC SQL/Operational Reports will be converted. SQL and EZ Query Reports that the client has written will NOT be converted. Orders/results are NOT being transferred to the 4.5 system. SCC can add a bridge to the old system for read-only/query purposes from Tools on the main menu. Ideally, the converted database will be ready for you as soon as you finish training. TIMELINE and PROCESS

8 TRAINING: For LAB / MIC Can attend System Design I and II for Lab 4.5 andSystem Design I and II for Mic 4.5 (4 weeks of training) Recommended if you have a team of relatively new resources. Can attend a combined Lab/Mic Upgrade to 4.5 class (3 days Lab, 2 days Mic). Recommended if you have a seasoned LIS team who have supported the current versions. For BB Upgrade training For PATHDx Currently training is done onsite (2 days common files training, 3 days PathDx specific training) At some point in the future, the common files training will be done at SCC, with specific PathDx training done onsite. LIVE New Servers Install SFW M12M11M10M9M8M7M6M5M4M3M2M1 Set up Conversion Trn SYSTEM PREP

9 FILE BUILD: Each file should be reviewed carefully (new specimen model, conversion, etc.) in Lab/Mic 4.5. New fields will need to be populated, if that functionality is to be used. Some new functionality will require set up (ie, Billing, more possible environments, call list rules, etc.) New MU2 tables to be built LIVE New Servers Install SFW M12M11M10M9M8M7M6M5M4M3M2M1 SYSTEM PREP Set up Conversion Trn File Build

10 REPORTS: 4.5 must be used with SoftREPORTS SCC will convert Patient Reports to SoftREPORTS. Some patient reports may need new fields added SCC will convert existing SQL and EZQuery reports to SoftReports. ODBC reports will need to be re-written based on new views. LIVE New Servers Install SFW M12M11M10M9M8M7M6M5M4M3M2M1 SYSTEM PREP Set up Conversion Trn File Build

11 INSTRUMENT TESTING Instrument interfaces and automation lines will be NEW interfaces Conversion of translation tables is performed but pipe rules may not convert correctly New specimen model must be accounted for Complete testing and revalidation is required. LIVE New Servers Install SFW M12M11M10M9M8M7M6M5M4M3M2M1 SYSTEM PREP LAB / MIC SU Set up Conversion Trn File Build Instrument Testing

12 VALIDATION Complete re-validation of system is recommended including:  Set ups and new functionality  Instrument and foreign interfaces  Billing  All applications  Be sure to do volume testing of your system and your interfaces LIVE New Servers Install SFW M12M11M10M9M8M7M6M5M4M3M2M1 SYSTEM PREP LAB / MIC SU Set up Conversion Trn Validation File Build Instrument Testing

13 INTERFACES Two choices: MU2 compliant (HL7 v2.5.1) or legacy (HL7 v 2.4). If legacy interfaces, IB would remain the same but OB will go through ESB If v 2.5.1 interfaces, IB could go through ESB and OB will go through ESB If v 2.5.1 interfaces, SCC will deliver interfaces that fit original specs plus MU2 fields (we will make them fit as best as we can MU2 tables must be set up They are NEW interfaces; must be completely tested & re-validated LIVE New Servers Install SFW M12M11M10M9M8M7M6M5M4M3M2M1 SYSTEM PREP FOREIGN INTERFACES / ELR / REF LAB LAB / MIC SU EU Set up Conversion Trn Validation Integrated TestingSpecCoding / ConfigTesting / Validation File Build Instrument Testing

14 LIVE ACTIVATION There should be an ADT dump prior to LIVE; alternatively, SCC can copy patients from 4.0.x -> 4.5.x and visits (if makes sense). The other option is that ADT can be resent. At LIVE, ADT will be directed to new environment and will be stopped in the 4.0 environment. At LIVE, ORDERS will be directed to new environment and will be stopped in the 4.0 environment. Patients, orders and old results need to be accessible at Live in 4.5 environment. For Lab/Mic, orders in 4.0 will be Resulted in 4.0. RESULTS and BILLING will be generated out of 4.0. For reference lab interfaces, both 4.0 and 4.5 need to be maintained until 4.0 orders are resulted out. PATHDx – Old SoftPATH cases and new SoftPATHDx cases will be available in PATHDx. (Old SoftPATH cases will be available for read only access)

15 CAREFUL ORCHESTRATION An “Up-lementation” requires: STRONG LEADERSHIP VISION

16 Or all that work…

17 Questions?