Download presentation
Presentation is loading. Please wait.
Published byClarissa Morgan Modified over 8 years ago
1
SksMinus status 01 HB meeting 2008/4/1 白鳥昂太郎
2
Contents Target : 4 He target Aerogel Cherenkov counters : SAC Hyperball-J efficiency
3
4 He target Designed by Ishimoto-san
4
Plan Optimize Target length : < 300 mm (as short as possible) Target shape : Cylinder → Elliptic cylinder, material selection Arm design : To avoid SAC, BAC, HBJ frame Test Cooling test by refrigerator Existent vacuum chamber with the same arm length
5
AC design Index : n=1.03 ~4 photons BAC1,2 160×30×70 mm SAC1 : 250×80×70 mm SAC2 : 320×90×70 mm With 2 inch fine mesh PMT ~72 mm)×8 Inside : White box, w/ or w/o reflector It is necessary to design realistic one!
6
Discussion Double stage SAC or SAC+SFV ? 7 Li 692 keV yield by SAC+SFV (Master thesis) 9.5 counts/hour → 8.7 counts/hour (0-20°) : 8 %↓ 5.3 counts/hour → 4.6 counts/hour (0-8°) : 14%↓ SFV size is too large. (Not optimized) SAC efficiency has to be more than 96%. - detection efficiency by the double stage SAC is 92%.
7
Hyperball-J efficiency Total photo peak efficiency @ 1 MeV ray Original Point source : 6.1% Uniform source : 6.0% Modified Point source : 5.7% Uniform source : 5.7% W/o Target, BAC and SAC material
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.